Categorical exclusion · example
Eugene Alderwood No. 1 115-kV Rebuild and Upgrades
BPA would rebuild about 9.5 miles of the Alderwood Tap section of the Eugene-Alderwood 115-kV line, replacing 159 wood poles with steel monopoles. The old wood poles, insulators and conductors are at the end of their service life and have failed in extreme weather.2
Facts from Bonneville Power Administration public records, each linked by number to its source; checked November 13, 2026. Section notes by ePlan.
At a glance
- Where
- Along Oregon state highway 36 near the southern Willamette Valley, Lane County, Oregon, from the Highway 99 and OR 36 intersection two miles south of Junction City through Cheshire and Goldson to Alderwood Substation.2
- Size
- About 9.5 miles of transmission line; 159 structures replaced; about 35 acres temporarily and 28 acres permanently disturbed2
- Lead agency
- Bonneville Power Administration, U.S. Department of Energy2
- Review
- Categorical exclusion, documented in a categorical exclusion determination2
- Legal citation
- 10 C.F.R. Part 1021, Appendix B categories B1.3, B1.13, B4.6 and B4.132
- Status
- Categorical exclusion determination issued; the project page is dated July 8, 2026. Work was planned to start mid-July 2026.2
Timeline
Documents Bonneville Power Administration published
What the documents say
CX-036093.pdf
- Description of the Proposed Action
- Rebuilds 9.5 miles of line with 159 steel monopoles averaging 70 feet tall, plus access roads, culverts, landings, gates and a 1-acre storage yard.2
- Findings
- BPA finds the action fits a class in Appendix B, was not segmented, and has no extraordinary circumstances, so it is categorically excluded.2
- Project Site Description
- The 9.5-mile corridor runs along OR 36 through rural residential and farm land, crossing the Long Tom River and several creeks, mostly in delineated wetland areas.2
- 1. Historic and Cultural Resources
- Tribes and SHPO were consulted; a no adverse effect finding drew no comments, with a work-stoppage condition for inadvertent discoveries.2
- 2. Geology and Soils
- New footings, anchors, storage yard and roads disturb soil and rock, about 194 cubic yards for structure footings; rated no significance with conditions.2
Start one like it.
A project like Eugene Alderwood No. 1 115-kV Rebuild and Upgrades? Describe yours and ePlan drafts the categorical exclusion memo (or short EA) in the agency's format. Where will the project happen?
More examples
- Carriger Solar Interconnection, Klickitat CountyCategorical exclusion · Record posted July 27, 2026
- Chicago Libraries Solar Power, Chicago and West ChicagoCategorical exclusion · Determination review completed June 10, 2026
- San Carlos Hospital Community Microgrid, PeridotCategorical exclusion · NEPA determination signed February 11, 2026
- Piccadilly Flats, City of PortlandCategorical exclusion subject to 24 CFR 50.4 · Review certified October 27, 2026
NEPA Categorical Exclusion Memo · All Federal NEPA projects
Sources
- DOE NEPA categorical exclusion determination pageenergy.gov
- CX-036093.pdfenergy.gov