Construction stormwater

Where is the construction site?

Disturbing an acre or more? Answer four questions and get a site-specific SWPPP draft with BMPs, an inspection form and NOI notes. Free to read.

  • Free to read
  • No sign-up until the draft
  • Every fact cites its source
STABILIZED ENTRANCE SILT FENCE · 340 FTINLET PROTECTION DISTURBED AREA · 1.4 AC

ePlan fills in

  • Which permit covers the site
  • Receiving water and impairments
  • Design storm
  • Soils and erodibility
  • Slope

How it works

Stormwater pollution prevention plan, from one answer

  1. Enter the siteOne answer starts the project. ePlan names it and looks up the place.
  2. Answer three questions about the work3 more questions, each with a "not sure yet" way out.
  3. Read the SWPPP free; download it for $49The draft marks what to check (amber), what to pick (blue) and what to fill in (violet).

What you get

Stormwater pollution prevention plan and 3 more documents

The first draft is free to read. Each document after it is drafted from the same confirmed facts.

The first draft

Stormwater pollution prevention plan (SWPPP)

  1. Stormwater team and operators
  2. Site description: activity, acres disturbed, phases, site map
  3. Receiving waters, impaired waters and discharge points
  4. Erosion and sediment controls by phase
  5. Stabilization schedule
  6. Pollution prevention: fueling, washout, waste, dewatering

Modeled on: EPA SWPPP template for the 2022 CGP, or the state's template

Next · 2

Notice of intent (NOI) draft

  1. Operator and site information
  2. Permit and eligibility: endangered species and historic properties
  3. Receiving waters and discharge points
  4. Confirmation the SWPPP was prepared first
Next · 3

Site inspection report form

  1. Date, inspector and weather
  2. Rain since last inspection
  3. BMP condition by location
  4. Discharges observed
  5. Corrective actions and dates
Next · 4

Site map notes

  1. Limits of disturbance
  2. Drainage and discharge points
  3. BMP locations by phase
  4. Stockpiles, washout and staging

From public data

What ePlan fills in, and from where

1 acre

Construction that disturbs one acre or more, or less as part of a larger common plan, needs stormwater permit coverage.
Source: 40 CFR 122.26(b)(15)

Questions

SWPPP: what people ask

Who needs a SWPPP?

Construction operators who disturb one acre or more, or less as part of a larger common plan of development or sale, need stormwater permit coverage, and those permits require a SWPPP. Under EPA's permit, the SWPPP must be prepared before you file the notice of intent.

Source: epa.gov

Which permit covers my site?

EPA's 2022 Construction General Permit covers Massachusetts, New Hampshire, New Mexico, Washington DC, Puerto Rico, most other territories, most Indian Country and some federal facilities. Everywhere else, the state issues its own construction general permit with its own SWPPP rules.

Source: epa.gov

How often must the site be inspected?

Under EPA's 2022 permit, at least every 7 calendar days, or every 14 days plus within 24 hours of a storm of 0.25 inches or more. State permits set their own schedules.

Source: epa.gov

Can I write my own SWPPP in California?

Only if you are qualified. California's Construction General Permit requires the SWPPP to be developed by a Qualified SWPPP Developer (QSD). ePlan's draft gives a QSD a filled-in starting point to review, complete and certify.

Source: waterboards.ca.gov

What changes in 2027?

EPA's 2022 permit expires at 11:59 pm on February 16, 2027. EPA proposed the 2027 permit in August 2026, and sites covered by the 2022 permit will need new coverage under the 2027 permit.

Source: epa.gov