Design criteria table
- Resource
- Criterion as written
- Source: plan standard, plan guideline, National Core BMP or prior decision
- Mandatory (standard) or departure allowed (guideline)
- Units or activities it applies to
- Who checks it, and when
NEPA · design criteria
Build the design criteria (resource protection measures) table for your EA or CE from your forest plan, National Core BMPs and signed decisions.
ePlan fills in
How it works
What you get
The first draft is free to read. Each document after it is drafted from the same confirmed facts.
Modeled on: National Core BMP Technical Guide, FS-990a
From public data
of forest plan constraint: standards are mandatory, and guidelines allow departure if their purpose is met. Each criterion should say which it follows.
Source: 36 CFR 219.7(e)(1)(iii)–(iv)
Questions
Yes. Every project must be consistent with the applicable plan components, and the approval document must say how. Under plans revised with the 2012 planning rule, standards are mandatory and a project may depart from a guideline only if it still meets the guideline's purpose.
The Forest Service's national best management practices for water quality on National Forest System lands, published in April 2012 as the National Core BMP Technical Guide, FS-990a. Water and soil design criteria can cite them by number.
The 1990 Tahoe National Forest Land and Resource Management Plan, as amended by the 2004 Sierra Nevada Forest Plan Amendment and the Sierra Nevada Forests Management Indicator Species Amendment.
Related doors
What are you planning on the Eldorado?
Where is your client's forest?
Where is your woodland?
Where is the land under easement?
Where are the trees you'll clear?
What's the name of your fuel break?
Answer it and the project exists. Three more questions, then the draft.