Contractors and owners · grading

Where are you grading?

Draft the erosion and sediment control plan, grading narrative and dust control plan your city or county wants with the grading permit. Free to read.

  • Free to read
  • No sign-up until the draft
  • Every fact cites its source
STABILIZED ENTRANCE SILT FENCE · 340 FTINLET PROTECTION DISTURBED AREA · 1.4 AC

ePlan fills in

  • City or county
  • Slope
  • Soils and erodibility
  • Streams and wetlands
  • Design storm

How it works

Erosion and sediment control plan, from one answer

  1. Enter the siteOne answer starts the project. ePlan names it and looks up the place.
  2. Answer three questions3 more questions, each with a "not sure yet" way out.
  3. Read the plan free; download it for $49The draft marks what to check (amber), what to pick (blue) and what to fill in (violet).

What you get

Erosion and sediment control plan and 2 more documents

The first draft is free to read. Each document after it is drafted from the same confirmed facts.

The first draft

Erosion and sediment control plan

  1. Site, owner and contractor
  2. Existing conditions: slope, soils, drainage
  3. Limits of disturbance and phasing
  4. Erosion controls
  5. Sediment controls
  6. Stabilized entrance and trackout
Next · 2

Grading permit narrative

  1. Scope: cut, fill, import and export
  2. Drainage
  3. Slopes and retaining walls
  4. Haul route
  5. Schedule
Next · 3

Dust control plan

  1. Responsible person
  2. Disturbed area
  3. Control measures by activity
  4. Trackout
  5. Wind events and stabilization
  6. Records

Modeled on: Maricopa County Rule 310

From public data

What ePlan fills in, and from where

0.10 acre

of disturbed soil needs a dust control permit in Maricopa County, Arizona, and the dust control plan goes in with the application.
Source: Maricopa County Air Quality, Rule 310

Questions

Grading and erosion control plan: what people ask

Do I need a SWPPP as well as a grading permit?

If the project disturbs one acre or more, or less as part of a larger common plan of development or sale, it needs construction stormwater permit coverage and a SWPPP on top of any local grading permit.

Source: ecfr.gov

When do I need a dust control permit?

Your air district decides. In Maricopa County, Arizona, Rule 310 requires a dust control permit, with a dust control plan, for disturbing 0.10 acre (4,356 square feet) or more. Sites over one acre also need a trained site representative.

Source: maricopa.gov

Are grading permit thresholds the same everywhere?

No. Each city or county adopts its own grading code. Los Angeles County, for example, lists what needs no grading permit in Building Code section J103.2, and requires a permit for other grading.

Source: ladpw.org

The rules this door follows