Texas electric co-ops and city-owned utilities

Which service territory does the plan cover?

Draft the wildfire mitigation plan Texas PUC rule 25.60 requires of co-ops and utilities with lines in a wildfire risk area. Free to read.

  • Free to read
  • No sign-up until the draft
  • Every fact cites its source

ePlan fills in

  • Wildfire risk by area
  • Lines in risk areas
  • Fuels along lines
  • Fire weather
  • Communities exposed

How it works

Wildfire mitigation plan and PUC application, from one answer

  1. Enter your territory and line miles, and say how you inspect, trim and shut off lines.One answer starts the project. ePlan names it and looks up the place.
  2. ePlan maps wildfire risk along your lines and fills each item rule 25.60 asks for.3 more questions, each with a "not sure yet" way out.
  3. Read the draft free, then download it for your independent expert and PUC filing.The draft marks what to check (amber), what to pick (blue) and what to fill in (violet).

What you get

Wildfire mitigation plan and PUC application and 3 more documents

The first draft is free to read. Each document after it is drafted from the same confirmed facts.

The first draft

Wildfire mitigation plan and PUC application (16 TAC 25.60)

  1. Executive summary and requirement index
  2. Wildfire risk areas and maps
  3. Wildfires in the last 10 years
  4. Inspection program
  5. Vegetation management plan
  6. Operations plan to reduce ignitions

Modeled on: PUC of Texas rule 16 TAC 25.60(f) application contents; Texas Utilities Code 38.080

Next · 2

Annual plan report (due May 1)

  1. Plan measures completed
  2. Inspections and vegetation work done
  3. Wildfires and shutoffs this year
  4. Changes planned
Next · 3

Vegetation management plan

  1. Clearance standards by line type
  2. Inspection and trim cycles
  3. Hazard tree program
  4. Records and contractor oversight
Next · 4

Public safety power shutoff protocol

  1. Weather triggers
  2. Coordination with the grid operator
  3. Customer and first responder notice
  4. Patrols before re-energizing

From public data

What ePlan fills in, and from where

60 days

before filing its plan, a Texas utility must file a notice of intent with the PUC
Source: 16 TAC 25.60(e), PUC of Texas

Questions

Wildfire mitigation plan and PUC application: what people ask

Who has to file a wildfire mitigation plan in Texas?

Every electric utility, city-owned utility and electric co-op that owns transmission or distribution facilities in a wildfire risk area. The Texas Division of Emergency Management or the utility can designate those areas. A notice of intent is due at least 60 days before the application.

Source: ftp.puc.texas.gov

What does the independent expert do?

The application must include an analysis of the plan by an independent expert with at least five years of electric utility fire-risk experience. The expert attests they didn't help design the plan and assesses whether it fits your system's size, wildfire risks and industry practice.

Source: ftp.puc.texas.gov

How long does approval last?

The PUC rules within 180 days of a sufficient application. You must reapply within three years of approval, or sooner after a material change, and file an annual report by May 1 starting the year after approval.

Source: ftp.puc.texas.gov

The rules this door follows