Subcontractors whose GC or the Corps wants a safety plan

Where is the job and what's the work?

Draft a site-specific safety plan with a hazard analysis (AHA) for each task, fall protection and emergency steps for your GC or a Corps job. Free to read.

  • Free to read
  • No sign-up until the draft
  • Every fact cites its source
BUILDINGWORK AREASTOREEXIT

ePlan fills in

  • Nearest hospital
  • Nearest fire station
  • Building outline
  • Heat and weather hazards
  • State plan rules

How it works

Site-specific safety plan with activity hazard analyses, from one answer

  1. Enter the job address, the work and who asked for the plan.One answer starts the project. ePlan names it and looks up the place.
  2. ePlan adds the nearest hospital and writes a hazard analysis for each activity.3 more questions, each with a "not sure yet" way out.
  3. Read the plan free, then download it for your competent person to sign.The draft marks what to check (amber), what to pick (blue) and what to fill in (violet).

What you get

Site-specific safety plan with activity hazard analyses and 3 more documents

The first draft is free to read. Each document after it is drafted from the same confirmed facts.

The first draft

Site-specific safety plan with activity hazard analyses

  1. Project, owner and contractor contacts
  2. Safety responsibilities and competent persons
  3. Activity hazard analysis for each task
  4. Fall protection
  5. Excavation, crane and hot work controls
  6. Heat illness prevention

Modeled on: USACE EM 385-1-1 accident prevention plan outline and OSHA 29 CFR 1926

Next · 2

Activity hazard analysis (AHA) for one task

  1. Job steps
  2. Hazards
  3. Controls
  4. Equipment, inspections and training
Next · 3

Daily safety briefing log

  1. Date and crew
  2. Tasks and hazards discussed
  3. Signatures
Next · 4

Emergency action plan for the site

  1. Reporting an emergency
  2. Evacuation and assembly point
  3. Head count
  4. Nearest hospital route

From public data

What ePlan fills in, and from where

$16,550

is OSHA's maximum penalty for each serious violation
Source: 29 CFR 1903.15(d)(3), eCFR

Questions

Site-specific safety plan with activity hazard analyses: what people ask

What does OSHA require of a contractor's safety program?

Employers must start and keep the programs needed to comply with OSHA's construction rules, with frequent and regular inspections of the job site, materials and equipment by competent persons they designate. Only workers qualified by training or experience may run equipment and machinery.

Source: ecfr.gov

When do I have to follow EM 385-1-1?

On construction, demolition or removal contracts with a Department of Defense agency, the FAR accident prevention clause requires the latest USACE EM 385-1-1 in effect on the solicitation date. If the contract adds Alternate I, you submit a written plan analyzing the significant hazards before work starts.

Source: ecfr.gov

Who can write a fall protection plan?

A fall protection plan is an option only for leading edge, precast concrete or residential construction work where conventional fall protection is infeasible or more hazardous. A qualified person must prepare it for the specific site and approve changes, and a copy stays on the job.

Source: ecfr.gov