California builders and remodelers pulling permits

Where is the project and what's being built?

Free check of California's CALGreen construction waste rule: whether your job must divert 65%, which way to comply, and what the city wants filed.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door
BUILDINGWORK AREASTOREEXIT

ePlan fills in

  • Parcel
  • Building outline
  • Recyclers and landfills nearby

How it works

CALGreen construction waste checklist, from one answer

  1. Enter the project address, type and size.
  2. ePlan checks whether the 65% rule applies and which compliance path fits.
  3. Read the checklist free. Need the crew's safety plan too? Start a site-specific safety plan.

What you get

CALGreen construction waste checklist and 1 more document

The check is free. The paperwork after it is drafted at the Site-specific safety plan with activity hazard analyses door.

The first draft

CALGreen construction waste checklist (free)

  1. Does CALGreen apply to this permit
  2. Pick a compliance path
  3. Materials to divert and haulers
  4. Tracking diversion by weight
  5. Recycling areas in the finished building
  6. Final report for inspection

Modeled on: CalRecycle summary of CALGreen Construction Waste Management Requirements (4.408 and 5.408)

Next · 2

Site-specific safety plan

  1. Hazard analysis for each activity
  2. Competent persons and inspections
  3. Emergency steps
  4. Training

From public data

What ePlan fills in, and from where

65%

of nonhazardous construction and demolition waste must be recycled or salvaged on covered California projects
Source: CALGreen 4.408.1 and 5.408.1, CalRecycle summary

Ready for the paperwork?

Draft a site-specific safety plan with a hazard analysis (AHA) for each task, fall protection and emergency steps for your GC or a Corps job. Free to read.

Site-specific safety plan with activity hazard analyses →

Questions

Construction Waste Management Plan: what people ask

What does CALGreen require for construction waste?

Covered projects must divert at least 65% of nonhazardous construction and demolition waste, shown through a waste management plan, a waste management company with verifiable documentation, or a disposal-weight limit (3.4 pounds per square foot for low-rise homes, 2 for nonresidential and high-rise).

Source: www2.calrecycle.ca.gov

Does a demolition-only permit count?

No. CalRecycle notes that a demolition-only permit, not part of a construction permit, is outside the scope of the CALGreen building code, and that cities using CALGreen should address recycling on those jobs separately.

Source: www2.calrecycle.ca.gov

What does a city waste plan form ask for?

Fresno's 2025 form, for example, is signed to comply with CALGreen 4.408 and 5.408 and asks for recycled and non-recycled waste and the percentage recycled, at least 65% of all construction and demolition debris.

Source: fresno.gov

The rules this door follows