Culvert sizing sheet (free)
- Crossing location and drainage area
- Design storm and rainfall
- Peak flow estimate
- Pipe size and length options
- Headwater and fill depth check
- Fish passage notes
Rural landowners, loggers and driveway contractors
Free culvert sizing sheet for a driveway or forest road crossing, with drainage area and design rainfall filled in. Your county or engineer confirms it.
ePlan fills in
How it works
What you get
The check is free. The paperwork after it is drafted at the Pre-Construction Notification door.
From public data
of stream or wetland loss is the most a road or driveway crossing can cause under nationwide permit 14
Source: Army Corps 2026 nationwide permits, 91 FR 768
Draft the Army Corps pre-construction notification (ENG Form 6082) for a dock, bank repair or small crossing. Wetlands and species checked. Free to read.
Questions
If the crossing places fill in a stream or wetland that is a water of the United States, it may qualify for nationwide permit 14. Losses are capped at 1/2 acre, and a notice is needed above 1/10 acre or in a wetland.
Building or maintaining farm and forest roads is exempt from Section 404 when best practices are followed, including bridging or culverting so fill doesn't restrict expected flood flows, and crossings that don't block fish and other aquatic life.
When the work's purpose is to bring an area of water into a use it wasn't previously subject to, and the flow or circulation is impaired or the reach of the water reduced. Then a permit is required even for otherwise exempt work.
Related doors
Where is the work in or near water?
Where is the excavation?
Where is the lot you want contours for?
What part or system are you analyzing?
Where is the project and what's being built?
Where is the construction site?
Answer it and ePlan opens the Pre-Construction Notification door with your answer filled in.