Rural landowners, loggers and driveway contractors

Where does the road cross the stream?

Free culvert sizing sheet for a driveway or forest road crossing, with drainage area and design rainfall filled in. Your county or engineer confirms it.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door

ePlan fills in

  • Drainage area
  • Design rainfall
  • Slope
  • Stream type

How it works

Culvert sizing sheet, from one answer

  1. Pin the crossing and pick the road type.
  2. ePlan pulls the drainage area, design rainfall and slope. It can't see the channel, so your county or engineer confirms the size.
  3. Read the free sheet. Filling in a stream or wetland? Start a nationwide permit PCN draft.

What you get

Culvert sizing sheet and 1 more document

The check is free. The paperwork after it is drafted at the Pre-Construction Notification door.

The first draft

Culvert sizing sheet (free)

  1. Crossing location and drainage area
  2. Design storm and rainfall
  3. Peak flow estimate
  4. Pipe size and length options
  5. Headwater and fill depth check
  6. Fish passage notes
Next · 2

Nationwide permit pre-construction notification

  1. Crossing and nationwide permit 14
  2. Stream and wetland losses
  3. Species and historic places

From public data

What ePlan fills in, and from where

1/2 acre

of stream or wetland loss is the most a road or driveway crossing can cause under nationwide permit 14
Source: Army Corps 2026 nationwide permits, 91 FR 768

Ready for the paperwork?

Draft the Army Corps pre-construction notification (ENG Form 6082) for a dock, bank repair or small crossing. Wetlands and species checked. Free to read.

Pre-Construction Notification →

Questions

Culvert Sizing Sheet: what people ask

Do I need a Corps permit for a culvert crossing?

If the crossing places fill in a stream or wetland that is a water of the United States, it may qualify for nationwide permit 14. Losses are capped at 1/2 acre, and a notice is needed above 1/10 acre or in a wetland.

Source: federalregister.gov

Are forest and farm roads exempt?

Building or maintaining farm and forest roads is exempt from Section 404 when best practices are followed, including bridging or culverting so fill doesn't restrict expected flood flows, and crossings that don't block fish and other aquatic life.

Source: ecfr.gov

When does the exemption not apply?

When the work's purpose is to bring an area of water into a use it wasn't previously subject to, and the flow or circulation is impaired or the reach of the water reduced. Then a permit is required even for otherwise exempt work.

Source: ecfr.gov

The rules this door follows