Contractors and developers building in cities that ask for a CMP

Where is the project?

Free check of whether your city wants a construction management plan before the building permit, and what it covers: hauling, staging, hours, neighbors.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door
BUILDINGWORK AREASTOREEXIT

ePlan fills in

  • Parcel
  • Street network
  • Schools and hospitals nearby
  • Aerial photo

How it works

Construction management plan checklist, from one answer

  1. Enter the address and what you're building.
  2. ePlan checks the city's CMP trigger and maps streets, schools and hospitals nearby.
  3. Read the checklist free; the site logistics drawing stays with your drafter. Next, start a site-specific safety plan.

What you get

Construction management plan checklist and 2 more documents

The check is free. The paperwork after it is drafted at the Site-specific safety plan with activity hazard analyses door.

The first draft

Construction management plan checklist (free)

  1. Does your city require a CMP?
  2. Project phases and duration
  3. Haul routes and truck trips
  4. Staging, deliveries and worker parking
  5. Street and sidewalk closures
  6. Work hours and noise

Modeled on: Your city's CMP rules (Santa Monica Municipal Code 8.98.030 as the worked example)

Next · 2

Site-specific safety plan (paid)

  1. Project and hazards
  2. Roles
  3. Training
  4. Emergency procedures
Next · 3

Traffic control plan notes

  1. MUTCD typical applications used
  2. Signs and devices
  3. Flaggers
  4. Whether your city wants an engineer's stamp

From public data

What ePlan fills in, and from where

16 units

or 7,500 sq ft of new nonresidential space triggers a construction management plan in Santa Monica when the work hauls material or closes the public right-of-way; it's due before the building permit
Source: City of Santa Monica, How to submit a construction management plan (SMMC 8.98.030)

Ready for the paperwork?

Draft a site-specific safety plan with a hazard analysis (AHA) for each task, fall protection and emergency steps for your GC or a Corps job. Free to read.

Site-specific safety plan with activity hazard analyses →

Questions

Construction Management Plan: what people ask

When does Santa Monica require a construction management plan?

When a project adds 16 or more homes, 7,500 sq ft or more of nonresidential space (1,000 sq ft downtown), and its hauling or work involves closing or using the public right-of-way. The plan is due before the building permit is issued.

Source: santamonica.gov

Do traffic control signs have to follow a standard?

Yes. The MUTCD approved by the Federal Highway Administrator is the national standard for traffic control devices on any street, highway or bicycle trail open to public travel, including privately owned roads, such as in shopping centers, where the public travels without access restrictions.

Source: ecfr.gov

Who reviews a CMP in Boston?

The Boston Transportation Department handles construction management plan review and negotiations. To meet with it, contact its permit branch by email or phone, as the city's street permit page lists.

Source: boston.gov

The rules this door follows