Runoff calculation sheet (free)
- Drainage area and outlet
- Design storms and rainfall depths
- Soils and curve numbers
- Time of concentration
- Peak flows before and after
- Notes for the engineer of record
Small civil firms, surveyors and land planners
Free TR-55 and rational-method runoff sheet for a small site, with Atlas 14 rainfall and soil groups filled in. Your engineer checks and signs the design.
ePlan fills in
How it works
What you get
The check is free. The paperwork after it is drafted at the SWPPP door.
From public data
of land disturbance is where federal construction stormwater permit coverage, and a SWPPP, starts
Source: 40 CFR 122.26(b)(15), eCFR
Disturbing an acre or more? Answer four questions and get a site-specific SWPPP draft with BMPs, an inspection form and NOI notes. Free to read.
Questions
From NOAA Atlas 14 through NOAA's Precipitation Frequency Data Server, which gives precipitation frequency estimates for a point you pick on a state map.
When construction disturbs 1 acre or more, or less than 1 acre that is part of a larger common plan of development that will disturb 1 acre or more.
Towns under a small MS4 permit must run a program for new development and redevelopment that disturbs 1 acre or more, using an ordinance or similar tool, and must ensure long-term operation and maintenance of the controls.
Related doors
Where is the construction site?
What equipment are you qualifying?
Where will the hot work happen?
Which parcel are you thinking of buying?
What address do you want history for?
Where are you grading?
Answer it and ePlan opens the SWPPP door with your answer filled in.