Small civil firms, surveyors and land planners

Where is the drainage area?

Free TR-55 and rational-method runoff sheet for a small site, with Atlas 14 rainfall and soil groups filled in. Your engineer checks and signs the design.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door
STABILIZED ENTRANCE SILT FENCE · 340 FTINLET PROTECTION DISTURBED AREA · 1.4 AC

ePlan fills in

  • Design rainfall
  • Soil groups
  • Land cover
  • Slope

How it works

Runoff calculation sheet, from one answer

  1. Pin the outlet and outline the drainage area.
  2. ePlan fills Atlas 14 rainfall, soil groups and land cover.
  3. Read the free calc sheet. Disturbing an acre or more? Start a SWPPP draft.

What you get

Runoff calculation sheet and 1 more document

The check is free. The paperwork after it is drafted at the SWPPP door.

The first draft

Runoff calculation sheet (free)

  1. Drainage area and outlet
  2. Design storms and rainfall depths
  3. Soils and curve numbers
  4. Time of concentration
  5. Peak flows before and after
  6. Notes for the engineer of record
Next · 2

Construction SWPPP

  1. Site and receiving water
  2. Erosion and sediment controls
  3. Inspections

From public data

What ePlan fills in, and from where

1 acre

of land disturbance is where federal construction stormwater permit coverage, and a SWPPP, starts
Source: 40 CFR 122.26(b)(15), eCFR

Ready for the paperwork?

Disturbing an acre or more? Answer four questions and get a site-specific SWPPP draft with BMPs, an inspection form and NOI notes. Free to read.

SWPPP →

Questions

TR-55 Runoff Calculator: what people ask

Where do the design rainfall depths come from?

From NOAA Atlas 14 through NOAA's Precipitation Frequency Data Server, which gives precipitation frequency estimates for a point you pick on a state map.

Source: hdsc.nws.noaa.gov

When does a site need a construction stormwater permit?

When construction disturbs 1 acre or more, or less than 1 acre that is part of a larger common plan of development that will disturb 1 acre or more.

Source: ecfr.gov

Do towns regulate runoff after construction?

Towns under a small MS4 permit must run a program for new development and redevelopment that disturbs 1 acre or more, using an ordinance or similar tool, and must ensure long-term operation and maintenance of the controls.

Source: ecfr.gov

The rules this door follows