ADU permit narrative
- Property and owner
- ADU type and size
- How it meets state standards: size, height, setbacks, parking
- Utilities
- Fee estimate and exemptions
- Approvals requested and the 60-day clock
Homeowners · ADU
Check your lot against California ADU law: size, setbacks, fees and the 60-day review clock. Get the permit narrative and checklist; bring your drawings.
ePlan fills in
How it works
What you get
The first draft is free to read. Each document after it is drafted from the same confirmed facts.
From public data
for a California city or county to approve or deny a complete ADU application.
Source: HCD ADU Handbook (Gov. Code 66317)
Questions
Within 60 days of a complete application. The city must tell you within 15 business days whether the application is complete.
Not for an ADU of 750 square feet or less of interior livable space. Above that, impact fees must be proportional to the square footage of the main home (Gov. Code 66311.5).
A local maximum must allow at least 850 square feet, or 1,000 for more than one bedroom, and cities can't block an 800-square-foot ADU with 4-foot side and rear setbacks. Without a compliant local ordinance, a detached ADU can be up to 1,200 square feet.
Not for an ADU. California law bars owner-occupancy requirements for ADUs (Gov. Code 66315). Junior ADUs have separate rules.
Related doors
Which site is the report for?
What is the project, and where?
Which jurisdiction is the plan for?
What's the property address?
Where is the house?
Where is the house?
Answer it and the project exists. Three more questions, then the draft.