North Rim & Roaring Springs Water System Improvements

The National Park Service will replace or rehabilitate the aging waterline between the North Rim and Roaring Springs, build a new water treatment plant at the North Rim, and add storage tanks, to make water supply more reliable.2

Facts from National Park Service public records, each linked by number to its source; checked November 13, 2026. Section notes by ePlan.

At a glance

Where
North Rim and Roaring Springs Canyon, Grand Canyon National Park, Arizona, including the inner canyon corridor from Supai Tunnel to Cottonwood Campground.2
Lead agency
National Park Service, Grand Canyon National Park (approved by the Acting Regional Director, Interior Regions 6, 7, & 8)2
Review
Environmental assessment, with a finding of no significant impact2
Legal citation
National Environmental Policy Act, 42 U.S.C. 4321 et seq., and Department of the Interior NEPA regulations, 43 CFR Part 462
Status
FONSI signed May 27, 20261

Timeline

  1. First civic engagement period2
  2. Second civic engagement period2
  3. EA public comment period2
  4. USFWS concurrence2
  5. Arizona SHPO signed Programmatic Agreement2
  6. FONSI signed1

Documents National Park Service published

What the documents say

FONSI and Non-Impairment Determination (signed 2026-05-27)

INTRODUCTION
Explains the EA was prepared under NEPA because the waterline between the North Rim and Roaring Springs has outlived its design life and fails often.2
SELECTED ALTERNATIVE AND RATIONALE FOR THE DECISION
NPS chose Alternative B over No Action: new boreholes for waterlines, a North Rim treatment plant, added storage tanks, and Roaring Springs Pumphouse rehabilitation.2
MITIGATION MEASURES
Avoidance and minimization measures and best management practices are built into the selected alternative and listed in Appendix A.2
PUBLIC INVOLVMENT
Two 14-day civic engagement periods and a 30-day EA comment period drew ninety-three correspondences, summarized in Appendix C.2
AGENCY AND TRIBAL CONSULTATION
USFWS concurred the action may affect but is not likely to adversely affect California condors and Mexican spotted owls; a Section 106 Programmatic Agreement was signed by the Arizona SHPO.2
SIGNIFICANCE CRITERIA REVIEW
Describes the affected environment, including the Bright Angel Peninsula, Roaring Springs Canyon, contractor camps, hauling routes and helicopter flight paths.2

Final EA (2026-03-06)

Chapter 1: Introduction, Background, and Purpose and Need
Sets out the purpose and need for the North Rim waterline and the Roaring Springs Pumphouse.3
Chapter 2: Alternatives
Compares Alternative A, No Action, with Alternative B, the proposed action and preferred alternative to improve the water system.3
Chapter 3: Affected Environment and Environmental Consequences
Analyzes historic districts, karst and hydrogeology, soundscapes and noise, special status species, and visitor use and experience.3
Appendix A: Alternatives Considered and Dismissed
Covers dismissed options such as boring alternatives, water sources, a surface-mounted waterline and full treatment at Roaring Springs Pumphouse.3
Appendix B: Mitigation Measures and Best Management Practices
Lists mitigation by topic, including air quality, karst and hydrogeology, soundscapes, visitor use, water resources, and wildlife.3
Appendix C: Impact Topics Dismissed from Further Analysis
Explains why topics such as air quality, archeology, floodplains, wetlands, wildlife and wilderness solitude were dismissed from detailed analysis.3
Appendix E: Consultation and Coordination
Records agency consultation, tribal consultation and civic engagement for the project.3

Start one like it.

A project like North Rim & Roaring Springs Water System Improvements? Describe yours and ePlan drafts the environmental assessment. What are you proposing, and where?

More examples

NEPA environmental assessment · All Federal NEPA projects

Sources

  1. NPS Planning, Environment and Public Comment project 117319parkplanning.nps.gov
  2. FONSI and Non-Impairment Determination (signed 2026-05-27)parkplanning.nps.gov
  3. Final EA (2026-03-06)parkplanning.nps.gov