Substantial improvement check (free)
- Flood zone and base flood elevation
- Market value of the structure
- Project cost
- Cost as a share of value
- What happens at 50% or more
- What your floodplain administrator will ask for
Homeowners and contractors remodeling in a flood zone
Free check of whether your remodel or repair trips FEMA's 50% rule, from the building's market value and the project cost. Your floodplain office decides.
ePlan fills in
How it works
What you get
The check is free. The paperwork after it is drafted at the ADU permit door.
From public data
of the structure's market value is the line: work costing that much or more is a substantial improvement
Source: 44 CFR 59.1, eCFR
Check your lot against California ADU law: size, setbacks, fees and the 60-day review clock. Get the permit narrative and checklist; bring your drawings.
Questions
Any reconstruction, rehabilitation, addition or other improvement whose cost equals or exceeds 50 percent of the structure's market value before construction starts. It includes work on structures that have had substantial damage.
Damage of any origin where restoring the structure to its before-damage condition would cost 50 percent or more of its market value before the damage occurred.
It must meet the same elevation rules as new construction. In zones A1-30, AE and AH, a substantially improved home must have its lowest floor, including the basement, at or above the base flood level.
Related doors
Can you build an ADU here?
Where will the FEMA-funded work happen?
Where is the new tower site?
Where is the federal-aid project?
Where will the crane or structure stand?
What are you proposing, and where?
Answer it and ePlan opens the ADU permit door with your answer filled in.