Scoping letter in the Umatilla's format
Project: !a post-fire fuel break
Prepared by ✎preparer · ✎date
Letterhead and district
This scoping letter in the Umatilla's format covers !a post-fire fuel break and the reasons for it, set out in the order the reviewing office expects.
Project, location and map
The site is shown on the attached map. The work area covers !the area measured from the map.
Purpose and need
The project is needed because ✎the problem it addresses, in one sentence. Its purpose is to !the outcome described in your files.
Proposed action
The work includes ✎each activity, with its size, method and equipment. Access, staging and timing are described below.
Design criteria
These measures apply for the whole project: ✎each measure, who carries it out and when. They follow 7 CFR 1b.4.
NEPA path
The criteria in 7 CFR 1b.4 turn on one question. Which ranger district? ?Heppner (Oregon).
How to comment
The people to inform are listed with how and when they hear about it: !who to notify and how. Their responses are kept with this scoping letter in the Umatilla's format.