Transaction screen pre-check (free)
- Property and current use
- Past uses and industry codes
- Owner and operator interview questions
- Nearby cleanup and tank sites
- Flood zone
- What the environmental professional must conclude
Small-loan borrowers and their lenders
Free pre-check before a transaction screen: past uses, nearby cleanup sites and owner questions, and when an SBA lender needs a Phase I instead.
ePlan fills in
How it works
What you get
The check is free. The paperwork after it is drafted at the Phase 1 ESA cost calculator door.
From public data
is how recent a Transaction Screen must be for an SBA loan: dated within one year of the SBA loan number
Source: SBA SOP 50 10 8.1
Estimate a Phase I environmental site assessment's cost and timing, then fill in the ASTM E1527-21 user questionnaire your consultant needs. Free to read.
Questions
SBA requires an environmental professional to supervise the site visit and conclude whether more investigation is warranted. The screen follows ASTM E1528-22: an owner or operator interview, a site visit, two questionnaires and a records review.
Not on its own. The federal All Appropriate Inquiries rule lists ASTM E1527-21 and E2247-23 Phase I standards as ways to comply; the E1528 transaction screen is not on that list.
If the environmental professional concludes further investigation is warranted, the SBA lender must get a Phase I ESA. Skipping straight to a Phase II needs an exception from SBA's Environmental Committee.
Related doors
Which property are you buying or financing?
Where is the project site?
Where is the work in the street?
Where are your California work sites?
Where is the ADU or addition?
Where is the construction site?
Answer it and ePlan opens the Phase 1 ESA cost calculator door with your answer filled in.