Where
8326 172nd St NE, Arlington, Washington 98223; Quilceda Creek basin, Snohomish watershed, WRIA 7; Section 25, 26, Township 31 N, Range 5 W.1
Size
32.26-acre site, with 29.43 acres of disturbance and 12.17 acres of new impervious area.1
Lead agency
City of Arlington1
Review
Stormwater pollution prevention plan, prepared as part of a Stormwater Site Plan1
Legal citation
Minimum Requirement 2 of the Stormwater Management Manual for Western Washington1
Status
SWPPP prepared February 2026 for the permit application1

Timeline

  1. SWPPP prepared1

Documents City of Arlington published

What the documents say

20260210 PJ26-0104 SWPPP

3.1.1 Project Data Summary
Lists applicant MJS Investors, parcels, Quilceda Creek basin, a 32.26-acre site, 29.43 acres of disturbance, no existing impervious area and 12.17 acres proposed.1
3.2 Introduction
States the SWPPP meets Minimum Requirement 2, covers conceptual construction activities, and aims to prevent erosion, sedimentation and water quality violations through BMPs.1
3.2.1 Element 1: Preserve Vegetation/Mark Clearing Limits
Calls for minimizing tree removal and soil compaction, retaining duff and native topsoil, and lists BMP C101 for preserving natural vegetation.1