Mitigated determination of non-significance · example

Cascade Middle School Replacement

Auburn School District will build a new middle school of about 118,000 square feet for 800 students, with room for 10 portables, athletic fields, a roundabout and street extensions, and will clean up pesticide-contaminated shallow soil during construction.1

Facts from Auburn School District No. 408 public records, each linked by number to its source; checked November 13, 2026. Section notes by ePlan.

At a glance

Where
1020 40th Street NE, Auburn, King County, Washington 98002; six King County parcels north of which is the Monterey Park neighborhood1
Size
Approximately 118,000 square feet building for 800 students; 10 future portables for 250 more students (1,050 total)3
Lead agency
Auburn School District No. 408 (lead agency for SEPA); the City of Auburn has land use permit authority2
Review
Mitigated determination of non-significance, with no EIS required3
Legal citation
RCW 43.21C.030(2)(c); issued under WAC 197-11-350(2)3
Status
MDNS issued November 3, 2026; comments due November 17, 20263

Timeline

  1. Checklist prepared2
  2. MDNS issued3
  3. Comments due3

Documents Auburn School District No. 408 published

What the documents say

MDNS

Description of Proposal
Describes a 118,000 square foot school for 800 students, 10 portables, two athletic fields, a roundabout at I Street NE and 40th Street NE, and street extensions.3
Proponent and Location of Proposal
Names Auburn School District No. 408 as proponent and gives the 40th Street NE address and six King County tax parcel numbers.3
Lead Agency and Threshold Determination
The district finds no probable significant adverse impact, requires no EIS, and assumes compliance with state law and City of Auburn ordinances on access, drainage and utilities.3
Water
Single condition requires wetland mitigation from the Critical Areas Report and Buffer Enhancement Plan, with City approval needed for buffer reduction beyond averaging, plus enhancement and monitoring.3
Comment Period and Appeal
Lead agency will not act for 14 days; comments go to the Responsible Official by November 17, 2026, and no administrative appeal exists.3

SEPA Checklist (without appendices)

Title and Project Team
Checklist for Cascade Middle School Replacement and Site Remediation, dated October 2026, listing the applicant and Shockey Planning Group as environmental consultant.2
Table of Contents
Covers background plus 16 environmental elements from earth to utilities, with figures for the site plan, vicinity, planting and field lighting, and a trip generation table.2
Appendices
Lists five appendices: legal description, geotechnical data report, stormwater site plan, SEPA sound analysis and traffic impact analysis report.2
A. Background
Names the applicant, consultant, architect and civil engineer, and states the City of Auburn holds land use permit authority while the district is SEPA lead agency.2
Proposed timing or schedule
Construction is expected to start in spring 2027 and finish July 2028, contingent on funding from a successful bond proposition.2

Start one like it.

A project like Cascade Middle School Replacement? Describe yours and ePlan drafts the SEPA environmental checklist. Where is the project in Washington?

More examples

SEPA Environmental Checklist · All State and local projects

Sources

  1. Washington SEPA Register, record 202604679apps.ecology.wa.gov
  2. SEPA Checklist (without appendices)apps.ecology.wa.gov
  3. MDNSapps.ecology.wa.gov