Italian contractors and trades on building sites

Where is the building site?

Draft the POS for one firm on one site from the coordinator's PSC and your crew, trade and tools. For Italian contractors and trades. Free to read.

  • Free to read
  • No sign-up until the draft
  • Every fact cites its source
BUILDINGWORK AREASTOREEXIT

ePlan fills in

  • Company (Registro Imprese)
  • Activity code (ATECO)
  • Site location
  • Coordinator's PSC

How it works

Piano operativo di sicurezza, from one answer

  1. Enter the site, upload the coordinator's PSC and describe your crew.One answer starts the project. ePlan names it and looks up the place.
  2. ePlan fills your company data and drafts the risks and measures for your trade.3 more questions, each with a "not sure yet" way out.
  3. Read the POS free, then download it to sign and send to the main contractor.The draft marks what to check (amber), what to pick (blue) and what to fill in (violet).

What you get

Piano operativo di sicurezza and 2 more documents

The first draft is free to read. Each document after it is drafted from the same confirmed facts.

The first draft

Piano operativo di sicurezza (POS)

  1. Company data and site roles
  2. Site, dates and work phases
  3. Tasks, machines and equipment
  4. Hazardous substances
  5. Risks by work phase
  6. Prevention and protection measures

Modeled on: D.Lgs. 81/2008, Annex XV; simplified POS model under art. 104-bis

Next · 2

DUVRI for work on a client's premises

  1. Overlapping activities
  2. Interference risks
  3. Measures
Next · 3

PiMUS for scaffolding

  1. Scaffold and drawing
  2. Assembly and dismantling
  3. Checks during use

From public data

What ePlan fills in, and from where

15 days

is the longest the checks on your POS may take after it is received; work starts only once they come back positive
Source: D.Lgs. 81/2008, art. 101(3), Normattiva

Questions

POS: what people ask

Who must write a POS?

The employer of each firm carrying out the work, for each individual site. A firm that only supplies materials or equipment is exempt.

Source: normattiva.it

What happens after I hand in my POS?

Before starting, each firm sends its POS to the main contractor, which checks it fits its own plan and passes it to the site coordinator. Work starts after a positive check, which must come within 15 days of receipt.

Source: normattiva.it

Is there a simplified POS model?

Yes. The law provides for simplified models for drafting the POS, the site coordination plan (PSC) and the building file, set by interministerial decree.

Source: normattiva.it

The rules this door follows