Contractors on building sites in Spain

Where is the construction site?

Free check for contractors in Spain: which safety study applies to the works, what your plan de seguridad y salud covers, and who approves it.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door
BUILDINGWORK AREASTOREEXIT

ePlan fills in

  • Cadastral parcel
  • Budget and size
  • Full or basic study
  • Approval route

How it works

Plan de seguridad y salud check, from one answer

  1. Enter the site and the project's budget, length and workforce.
  2. ePlan checks which study applies and what your plan must develop.
  3. Read the free check. Working on a site in Italy too? Start a POS draft.

What you get

Plan de seguridad y salud check and 2 more documents

The check is free. The paperwork after it is drafted at the POS door.

The first draft

Plan de seguridad y salud check (free)

  1. Site, promoter and contractor
  2. Which study applies: full or basic
  3. Work phases and risks from the study
  4. Your measures for each phase
  5. Alternative measures and their protection level
  6. Approval before work starts

Modeled on: Real Decreto 1627/1997, articles 4 and 7

Next · 2

Risk list by work phase

  1. Phase
  2. Risks
  3. Measures
Next · 3

POS for an Italian site (paid draft)

  1. Company and site roles
  2. Tasks and equipment
  3. Risks and measures

From public data

What ePlan fills in, and from where

500 person-days

or over 30 working days with more than 20 workers at once means the project needs a full safety and health study
Source: Real Decreto 1627/1997, article 4, BOE

Ready for the paperwork?

Draft the POS for one firm on one site from the coordinator's PSC and your crew, trade and tools. For Italian contractors and trades. Free to read.

POS →

Questions

Plan de Seguridad y Salud: what people ask

Who writes the plan de seguridad y salud?

Each contractor, based on the project's safety and health study or basic study, analysing and developing it for its own work. Any alternative measures it proposes must not lower the protection levels the study sets.

Source: boe.es

Who approves the plan?

The safety and health coordinator during the works approves it before work starts. Where no coordinator is required, the dirección facultativa takes on that role. On public works, the plan and the coordinator's report go to the awarding administration for approval.

Source: boe.es

When does the project need a full study?

When the budget is at least 75 million pesetas (about €450,759), the work lasts over 30 working days with more than 20 workers at once, it exceeds 500 person-days, or it involves tunnels, galleries, underground pipes or dams. Otherwise a basic study is enough.

Source: boe.es

The rules this door follows