California landscape designers and builders

Where is the landscape?

Free check of whether your California landscape falls under MWELO and which compliance path fits, with reference ET pulled in. Your city reviews it.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door
5 FT APN 018-224-07 ADU · 640 SQ FT

ePlan fills in

  • Reference ET
  • Parcel
  • Aerial photo

How it works

MWELO threshold check, from one answer

  1. Pin the site and enter the landscape area.
  2. ePlan checks the thresholds and pulls reference ET. It doesn't compute the official water budget; your designer and city do.
  3. Read the free check. Building a backyard unit? Start an ADU permit draft.

What you get

MWELO threshold check and 1 more document

The check is free. The paperwork after it is drafted at the ADU permit door.

The first draft

MWELO threshold check (free)

  1. Project type and landscape area
  2. Whether MWELO applies
  3. Prescriptive or performance path
  4. Reference evapotranspiration
  5. Plant water use groups
  6. Irrigation equipment
Next · 2

ADU permit application

  1. Site plan
  2. Floor plan
  3. Landscape and utilities

From public data

What ePlan fills in, and from where

500 sq ft

of landscape area on new construction that needs a permit, plan check or design review brings a California project under MWELO
Source: City of Pasadena, Water Efficient Landscape Ordinance

Ready for the paperwork?

Check your lot against California ADU law: size, setbacks, fees and the 60-day review clock. Get the permit narrative and checklist; bring your drawings.

ADU permit →

Questions

MWELO Calculator: what people ask

Does MWELO apply to my project?

It applies to new construction with 500 sq ft or more of landscape area, and to rehabilitated landscapes of 2,500 sq ft or more, when the project needs a building or landscape permit, plan check or design review.

Source: cityofpasadena.net

Is there a simpler path for small landscapes?

Yes. Residential and non-residential projects with 500 to 2,499 sq ft of landscape may use the Prescriptive Compliance Option. Rehabilitated landscapes of 2,500 sq ft or more use the Performance Compliance Option.

Source: cityofpasadena.net

Where is the rule written?

The full text of MWELO is in sections 490 to 495, Chapter 2.7, Division 2, Title 23 of the California Code of Regulations. Your city applies it through its own plan review.

Source: cityofpasadena.net