Contractors working nights, weekends or near homes

Where is the work and when?

Free check of your city's construction hours and what an after-hours noise variance needs, with New York City as a worked example.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door
HOUSENEW WORK

ePlan fills in

  • Parcel and land use
  • Nearest homes
  • People nearby

How it works

After-hours noise variance checklist, from one answer

  1. Enter the address, the hours and the equipment.
  2. ePlan finds the allowed hours and estimates noise at the nearest homes.
  3. Read the checklist free. Need dust control for the same job? Start a dust control plan.

What you get

After-hours noise variance checklist and 1 more document

The check is free. The paperwork after it is drafted at the Grading and erosion control plan door.

The first draft

After-hours noise variance checklist (free)

  1. Allowed construction hours
  2. Work that needs a variance
  3. Noise mitigation measures
  4. Nearest homes and notices
  5. Application and fees
  6. What to post at the site

Modeled on: NYC DEP Construction Noise Mitigation Plan and DOB After Hours Variance

Next · 2

Dust control plan

  1. Site and disturbed area
  2. Dust sources
  3. Controls
  4. Inspections and records

From public data

What ePlan fills in, and from where

7 am to 6 pm

on weekdays is when New York City allows construction without after-hours authorization
Source: NYC Department of Environmental Protection

Ready for the paperwork?

Draft the erosion and sediment control plan, grading narrative and dust control plan your city or county wants with the grading permit. Free to read.

Grading and erosion control plan →

Questions

Noise Variance for After-Hours Construction: what people ask

When can I do construction in New York City?

Between 7 am and 6 pm on weekdays. At all other times, including any time on weekends, you must apply for after-hours authorization.

Source: nyc.gov

What is a construction noise mitigation plan?

In New York City, anyone doing construction must develop a Construction Noise Mitigation Plan before work starts and confirm it on the Department of Buildings application. It must already be in place before you seek an after-hours permit, and copies must be available on site.

Source: nyc.gov

Can neighbors see where after-hours work is allowed?

Yes. New York City's Department of Buildings publishes a real-time After Hours Variance map showing projects permitted to work outside normal hours.

Source: nyc.gov

The rules this door follows