Landowners planning a pond, waterway or terrace

Where is the field or pond site?

Free site check for a farm pond, grassed waterway or terrace: drainage area, soils, slope, whether a Corps permit applies, and who can design it.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door

ePlan fills in

  • Drainage area
  • Soils
  • Slope
  • Mapped wetlands

How it works

Conservation practice site check, from one answer

  1. Pin the site and pick the practice.
  2. ePlan maps drainage area, soils, slope and wetlands. An NRCS planner or engineer does the design.
  3. Read the free check. Work in a stream or wetland? Start a nationwide permit PCN draft.

What you get

Conservation practice site check and 1 more document

The check is free. The paperwork after it is drafted at the Pre-Construction Notification door.

The first draft

Conservation practice site check (free)

  1. Site and drainage area
  2. Soils and slope
  3. Mapped wetlands and streams
  4. Section 404 exemption check
  5. NRCS standard that applies
  6. Who designs and certifies it
Next · 2

Nationwide permit pre-construction notification

  1. Work in waters or wetlands
  2. Nationwide permit
  3. Species and historic places

From public data

What ePlan fills in, and from where

3,000

acre-feet squared, storage times effective dam height, is the cap for a low-hazard pond under North Dakota's NRCS pond standard
Source: NRCS Conservation Practice Standard 378, Pond (North Dakota, April 2022)

Ready for the paperwork?

Draft the Army Corps pre-construction notification (ENG Form 6082) for a dock, bank repair or small crossing. Wetlands and species checked. Free to read.

Pre-Construction Notification →

Questions

Farm Pond and NRCS Practice Design: what people ask

Do I need a Corps permit to build a farm pond?

Building or maintaining farm or stock ponds is exempt from Section 404. The exemption is lost if the work brings a water into a new use and impairs its flow or reduces its reach.

Source: ecfr.gov

Who can design an NRCS practice?

NRCS staff, or a technical service provider that NRCS has certified and placed on its approved list, or one selected through a contract.

Source: ecfr.gov

When is a pond low hazard?

North Dakota's NRCS pond standard applies to embankment ponds meeting low-hazard criteria, where storage times the dam's effective height is less than 3,000 acre-feet squared. Other states publish their own version of the standard.

Source: efotg.sc.egov.usda.gov