Southern California developers and builders

Where is the project?

Free check of whether your Southern California project needs a WQMP, with San Bernardino County's thresholds as the worked example. Your city decides.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door
STABILIZED ENTRANCE SILT FENCE · 340 FTINLET PROTECTION DISTURBED AREA · 1.4 AC

ePlan fills in

  • Soils
  • Land cover
  • Roof area
  • Impaired waters

How it works

WQMP threshold check, from one answer

  1. Pin the site and enter the impervious area.
  2. ePlan checks the county thresholds and pulls soils and land cover. Your city's reviewer has the final say.
  3. Read the free check. Disturbing an acre or more? Start a SWPPP draft.

What you get

WQMP threshold check and 1 more document

The check is free. The paperwork after it is drafted at the SWPPP door.

The first draft

WQMP threshold check (free)

  1. Project location and watershed
  2. New and replaced impervious area
  3. Priority project categories
  4. Soils and infiltration
  5. Likely BMP types
  6. Who prepares and signs the WQMP
Next · 2

Construction SWPPP

  1. Site and receiving water
  2. Erosion and sediment controls
  3. Inspections

From public data

What ePlan fills in, and from where

10,000 sq ft

of new impervious surface is where new development in San Bernardino County's Santa Ana watershed area needs a WQMP
Source: San Bernardino County Land Use Services FAQ (updated Dec. 4, 2024)

Ready for the paperwork?

Disturbing an acre or more? Answer four questions and get a site-specific SWPPP draft with BMPs, an inspection form and NOI notes. Free to read.

SWPPP →

Questions

WQMP: what people ask

Does my project need a WQMP?

In San Bernardino County's Santa Ana watershed area: new development creating 10,000 sq ft or more of impervious surface, or redevelopment adding or replacing 5,000 sq ft or more. In the Mojave area the threshold is 5,000 sq ft.

Source: lus.sbcounty.gov

Which project types have lower thresholds?

In the Santa Ana area: auto repair shops and restaurants at 5,000 sq ft, hillside development of 5,000 sq ft or more on erosive soils, and gas stations of 5,000 sq ft or more or with 100 or more average daily trips.

Source: lus.sbcounty.gov

Why do cities require a WQMP?

Large and medium municipal storm sewer permits must include a program to reduce pollutants in runoff from areas of new development and significant redevelopment after construction. The WQMP is how these cities apply it to each project.

Source: ecfr.gov

The rules this door follows