Western farmers, ranchers and landowners with a water right

Which water right do you want to change?

Free checklist for moving a water right's point of diversion, place or use: what Utah's change application needs and what it costs. Not legal advice.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door
WETLAND · 0.6 AC (NWI) CROSSING · 24 IN CULVERT HUC-12 180201250701

ePlan fills in

  • Water right record
  • Parcel
  • Nearby streams

How it works

Water right change checklist, from one answer

  1. Enter the water right number and the change you want.
  2. ePlan pulls the right's record, the parcel and nearby streams.
  3. Read the free checklist. Building a new diversion in a stream? Start a nationwide permit PCN draft.

What you get

Water right change checklist and 1 more document

The check is free. The paperwork after it is drafted at the Pre-Construction Notification door.

The first draft

Water right change checklist (free)

  1. Water right and owner of record
  2. Current and proposed diversion, place and use
  3. Quantity and period of use
  4. Legal descriptions and map
  5. Filing fee estimate
  6. Protest risks to raise with a water rights attorney or engineer
Next · 2

Nationwide permit pre-construction notification

  1. New diversion or headgate in a stream
  2. Waters affected
  3. Species and historic places

From public data

What ePlan fills in, and from where

$150

is Utah's starting filing fee for a change application, for up to 0.1 cfs or 20 acre-feet; the fee rises with flow or volume
Source: Utah Division of Water Rights fee schedule (revised May 28, 2026)

Ready for the paperwork?

Draft the Army Corps pre-construction notification (ENG Form 6082) for a dock, bank repair or small crossing. Wetlands and species checked. Free to read.

Pre-Construction Notification →

Questions

Water Right Change Application: what people ask

What counts as a change to a water right in Utah?

A change to the point of diversion, place of use, period of use, nature of use, or storage of water. A change can be permanent or for a fixed time of more than one year and up to 10 years.

Source: le.utah.gov

Who can file a change application?

In Utah: the holder of an approved but unperfected application, the record owner of a perfected right, a person with written authorization from either, or a water company shareholder authorized under section 73-3-3.5.

Source: le.utah.gov

What does Utah charge to file?

Change application fees follow the greater of flow or volume. The lowest tier, up to 0.1 cfs or 20 acre-feet, is $150; up to 0.5 cfs or 100 acre-feet is $200, and the fee keeps rising from there.

Source: waterrights.utah.gov

The rules this door follows