Grantees and small consultants collecting environmental data

What will you sample, and where?

Check your quality assurance project plan against EPA's QAPP Standard: the four element groups, who approves it and when. A free checklist.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door
WETLAND · 0.6 AC (NWI) CROSSING · 24 IN CULVERT HUC-12 180201250701

ePlan fills in

  • Waterbody and impairments
  • Stream network
  • Watershed
  • Sampling sites

How it works

QAPP readiness checklist, from one answer

  1. Describe what you'll sample, where and with which lab.
  2. ePlan pulls the waterbody's assessment status and sorts your plan into EPA's four groups.
  3. Read the free checklist. Need NEPA for the project too? Start an environmental assessment draft.

What you get

QAPP readiness checklist and 2 more documents

The check is free. The paperwork after it is drafted at the NEPA environmental assessment door.

The first draft

QAPP readiness checklist (free)

  1. Group A: project management and data quality objectives
  2. Group B: sampling, methods and lab quality control
  3. Group C: assessment and oversight
  4. Group D: data review and usability
  5. Approvals and distribution list
  6. Gaps to close before you submit

Modeled on: EPA QAPP Standard, CIO 2105-S-02.1 (2024)

Next · 2

NEPA environmental assessment (EA)

  1. Purpose and need
  2. Alternatives
  3. Affected environment and effects
Next · 3

Sampling and analysis plan outline

  1. Sites and frequency
  2. Methods
  3. Quality control samples

From public data

What ePlan fills in, and from where

4 groups

of required elements make up a QAPP under EPA's 2024 standard: project management, implementation, assessment and oversight, and information review
Source: EPA QAPP Standard, CIO 2105-S-02.1

Ready for the paperwork?

Draft a NEPA environmental assessment and FONSI, or an EIS outline, that follows a reference document. Free to read; every unconfirmed fact is marked.

NEPA environmental assessment →

Questions

QAPP readiness checklist: what people ask

When does a QAPP have to be approved?

Before the work. EPA's standard says QAPPs must be approved before environmental information is collected, produced, evaluated or used, except where immediate action is needed to protect human health and the environment.

Source: epa.gov

What goes in a QAPP?

EPA's standard arranges the required elements in four groups: A, project management and data quality objectives; B, implementing environmental information operations; C, assessment and oversight; D, information review and usability.

Source: epa.gov

Does my EPA grant need one?

If it involves environmental data. Quality assurance applies to all EPA assistance agreements involving environmental data collection, production or use, and the recipient submits a written quality assurance system for EPA approval.

Source: ecfr.gov

The rules this door follows