What is a mitigated negative declaration?
It is a negative declaration with the fixes built in first. The initial study finds potentially significant effects, the applicant revises the project before release, and the agency proposes a finding of no significant effect[4][9].
A plain negative declaration needs no revisions, because the initial study shows no substantial evidence of a significant effect. If that evidence survives the revisions, the agency prepares an environmental impact report instead[4][10].
| Aspect | Negative declaration | MND | EIR |
|---|---|---|---|
| When it fits | No evidence of a significant effect | Agreed revisions clear the effects | Substantial evidence of a possible significant effect[10] |
| Private project deadline, from a complete application | 180 days | 180 days[11] | One year[12] |
| Monitoring program | None, with no measures | Required[13] | Required for adopted measures[13] |
| In court | Fair argument, no deference | Fair argument, no deference | Abuse of discretion[14] |
| Filed in 2025 | 150[15] | 985[2] | 253 drafts[3] |
How long does an MND take?
About three months from filing to approval, once the document is written. Of the 1,101 projects whose first MND reached the State Clearinghouse from October 2023 to September 2024, 734 (67%) had the lead agency's notice of determination in CEQAnet by September 2026: a median 92 days later, and 81% of them within six months[2][7].
Treat that as a floor. CEQAnet has no dates for studies and drafting before filing, and a local agency's notice reaches the Clearinghouse only when a state agency has an approval, so the other third may be approved too[8]. A draft EIR takes a median 207 days to the same notice.
| Step | Median | Middle half | Projects |
|---|---|---|---|
| MND public review (filed Oct 2025 – Sep 2026) | 30 days | 29 to 31 days | 923 |
| First MND to notice of determination (filed Oct 2023 – Sep 2024) | 92 days | 60 to 154 days | 734 |
| First negative declaration to notice of determination (same window) | 78.5 days | 61 to 124.5 days | 122 |
Why an MND fails: the fair argument test
An MND gets less protection in court than an EIR. If substantial evidence supports a fair argument that the project may have a significant effect, the agency must prepare an EIR even when other evidence says it won't, and the court does not defer on that question[10][14].
Moving to an EIR after filing looks rare, though a change of course before filing never shows. Of 2,342 projects with a first MND filed October 2022 to September 2024, 11 (0.5%) later show a notice of preparation or draft EIR on the same SCH number[16]. Cypress's warehouse took about a month[17]. Weak points to check:
- Late revisions: they must be made or agreed before release for public review, not after[4]
- Deferred mitigation: Sundstrom rejected adopting whatever a later study recommended; details can wait only with performance standards[18][19]
- Neighbors' testimony: in Pocket Protectors, residents' observations on aesthetics counted as substantial evidence, and the MND fell[14]
- Changes after notice: a substantial revision means recirculating; a swapped measure needs a hearing and finding[20][21]
MND filings are falling: check for an exemption first
MND filings fell from 1,345 in 2022 to 985 in 2025, and January to October 2026 ran 9% below 2025[2]. Residential MNDs fell from 359 in the year to September 2023 to 214 in the year to September 2026. That began before the AB 130 infill housing exemption took effect in June 2025[22], so the filings don't show why.
So check CEQA exemptions first. If you need an MND, plan for biology: 95% of those filed in the past year list biological resources among their issues, then geology and air quality (81%), cultural resources (80%), noise (79%) and tribal cultural resources (71%)[2].
| Year | MND | Negative declaration | Draft EIR |
|---|---|---|---|
| 2022 | 1,345 | 220 | 285 |
| 2023 | 1,278 | 161 | 282 |
| 2024 | 1,115 | 181 | 302 |
| 2025 | 985 | 150 | 253 |
| 2026, to November 4 | 775 | 106 | 208 |