10 CFR 1021 and the DOE NEPA procedures: what each holds
Since July 3, 2025, 10 CFR part 1021 holds appendix A (routine actions excepted from NEPA), appendix B (DOE's categorical exclusions as of then), related requirements and an emergency provision[2][7]. DOE made that change by interim final rule, still not final on October 4, 2026[2][8]. Everything else, including exclusions added since, is in the procedures, which DOE calls guidance, not a regulation[1].
DOE first decides whether NEPA applies; CERCLA cleanups and cross-border transmission permits, for example, do not trigger it. If it does, DOE uses an exclusion where one fits, relies on an existing document, or prepares an EA or EIS[1].
DOE categorical exclusions: appendix B and integral elements
Appendix B groups exclusions from facility operation (B1) to waste management (B6), and appendix C lists exclusions adopted from other agencies. Every appendix B class carries five integral elements, such as no threatened violation of safety or environmental rules and no significant impact on sensitive resources[1]. Common classes:
How DOE makes a categorical exclusion determination
DOE must find that the proposal fits one or more appendix B or C classes, was not split to fit, and has no extraordinary circumstance likely to cause a significant adverse effect. The proposal may be changed to avoid one[1].
On September 25, 2026, ARPA-E's NEPA Compliance Officer signed CX-271092 for Tandem PV, Inc.: research on perovskite-silicon tandem solar modules at its Fremont, California plant, with field tests at Sandia in Albuquerque and in Aurora, Colorado. The form applied four classes at once: B3.6, B3.11, B5.15 and B5.16[3].