What triggers HRS Chapter 343 review?
Section 343-5(a) lists nine triggers for an EA, unless an exemption applies; an applicant's action must also need discretionary approval[2][3]. They include:
- Use of state or county lands or funds, except planning studies and some land purchases[2]
- Any use in a conservation district, shoreline area, listed historic site or the Waikiki Special District
- County general plan amendments to designations other than agriculture, conservation or preservation, unless county-initiated
- New or expanded helicopter facilities that may affect a conservation district, shoreline area or historic site
- Wastewater treatment units (except some small systems), waste-to-energy facilities, landfills, oil refineries and power plants
Which actions are exempt from a Hawaii EA?
HAR section 11-200.1-15 lists ten general types of exempt actions, such as repairs, same-site replacement, small new structures and some affordable housing; each use needs a documented exemption notice[7][4][1]. No exemption covers successive actions with a significant cumulative impact, or a possibly significant action in a particularly sensitive environment[4].
Example: in 2005 the state Department of Transportation exempted the Hawaii Superferry's operation at Kahului Harbor, with about 40 million dollars in state funds going to four harbors. On August 31, 2007 the Hawaii Supreme Court held the exemption erroneous as a matter of law and required an EA[8].
How does a Hawaii EA lead to a FONSI or an EISPN?
The agency or applicant consults early, then prepares a draft EA[4]. If a FONSI is anticipated, the draft is published with that notice for comment, and the final EA answers every substantive comment in writing[2][4].
The agency then issues the FONSI or EISPN, within 30 days for an applicant action[4]. An agency expecting an EIS may skip the EA and start with an EISPN[2]. A suit against a FONSI must be filed within 30 days of public notice[9].
How does an agency decide if an effect is significant?
The agency weighs all effects, including mitigation. An action is generally significant if it may[4]:
- Irrevocably commit a natural, cultural or historic resource[4]
- Conflict with the State's long-term environmental policies, or substantially harm community welfare or cultural practices
- Substantially harm public health, air or water quality, noise, scenic vistas, or rare, threatened or endangered species
- Have adverse secondary or cumulatively significant effects
- Affect, or be damaged in, a flood plain, tsunami zone or sea level rise area
- Need substantial energy or emit substantial greenhouse gases