Carbon storage developers and landowners near proposed wells

Which state and site is the well in?

Free checklist of what a Class VI carbon storage well permit application must contain, who issues it in your state and the 50-year monitoring default.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door
A HORIZON · LOAMB · SANDY LOAM · PERC 24 MIN/INSEASONAL HIGH WATER · 54 IN 1,000 GAL

ePlan fills in

  • Permitting authority
  • Regulated facilities nearby
  • Geologic maps

How it works

Class VI application checklist, from one answer

  1. Enter the state, the site and the planned injection rate.
  2. ePlan finds who issues the permit and lists each plan and study the application needs.
  3. Project using federal funds or land? Start a NEPA environmental assessment draft.

What you get

Class VI application checklist and 1 more document

The check is free. The paperwork after it is drafted at the NEPA environmental assessment door.

The first draft

Class VI application checklist (free)

  1. Area of review map: wells, water and faults (146.82)
  2. Geology of injection and confining zones
  3. Area of review and corrective action plan (146.84)
  4. Financial responsibility (146.85)
  5. Well construction and testing (146.86, 146.87)
  6. Testing and monitoring plan (146.90)
Next · 2

NEPA environmental assessment draft

  1. Purpose and need
  2. Alternatives
  3. Affected environment
  4. Environmental consequences
  5. Agencies consulted

From public data

What ePlan fills in, and from where

50 years

of monitoring after injection stops is the default post-injection site care period for a Class VI well, unless the Director approves another timeframe
Source: 40 CFR 146.93(b), eCFR

Ready for the paperwork?

Draft a NEPA environmental assessment and FONSI, or an EIS outline, that follows a reference document. Free to read; every unconfirmed fact is marked.

NEPA environmental assessment →

Questions

Class VI Permit Application Checklist: what people ask

Who issues Class VI permits?

EPA, unless the state has primacy for Class VI wells. EPA's primacy table lists North Dakota, Wyoming, Louisiana, West Virginia, Arizona and Texas, and EPA signed a final rule approving Colorado's program on October 8, 2026.

Source: epa.gov

How long must the site be monitored after injection?

At least 50 years after injection stops, or an alternative timeframe the Director approves, and until the project no longer endangers underground sources of drinking water. The operator can ask to cut monitoring sooner with site data showing no endangerment.

Source: ecfr.gov

What must the application include?

Among other items: a map of the area of review showing wells, water bodies, springs, mines and known faults; geology of the injection and confining zones; seismic history; a table of wells that penetrate those zones; proposed operating data; well construction details; and an area of review and corrective action plan.

Source: ecfr.gov

The rules this door follows