Solar site screening report (free)
- Parcel, acres and access
- Nearest transmission lines and voltage
- Slope and buildable area
- Flood zone and wetlands
- Federal credit timing
- Next steps and who to call
Farmers and landowners sizing up a small solar farm
Free screen of a parcel for a 1-5 MW solar or battery project: distance to the grid, slope, flood zone, wetlands and the 2027 federal credit deadline.
ePlan fills in
How it works
What you get
The check is free. The paperwork after it is drafted at the NEPA environmental assessment door.
From public data
is the last placed-in-service date for federal wind and solar credits on projects that began construction after July 4, 2026
Source: 26 U.S.C. 48E(e)(4) and IRS Notice 2025-42
Draft a NEPA environmental assessment and FONSI, or an EIS outline, that follows a reference document. Free to read; every unconfirmed fact is marked.
Questions
Yes, says DOE, but all electrical equipment has to sit above the projected flood level. Raising it can increase installation cost, and insurance may cost more, so land that doesn't flood is usually the better fit.
For wind and solar projects that began construction after July 4, 2026, the federal production and investment credits apply only if the project is placed in service by December 31, 2027. IRS Notice 2025-42 explains how to show when construction began.
EIA points to the Homeland Infrastructure Foundation-Level Data (HIFLD) geoplatform for transmission line data and shapefiles. EIA and HIFLD do not publish substation locations.
Related doors
What are you proposing, and where?
Where is the land in the lease?
Which county, and how big is the project?
Which water system is the plan for?
What's the property address?
What is the project, and where?
Answer it and ePlan opens the NEPA environmental assessment door, which drafts the paperwork.