Solar, storage and wind developers with a project in a queue

What is your queue or project ID?

Free tracker for your generator interconnection request: queue position, study phase and posted dates, read from your grid operator's own queue file.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door
5 FT APN 018-224-07 ADU · 640 SQ FT

ePlan fills in

  • Queue position
  • Study phase
  • Posted dates
  • Point of interconnection
  • Nearby queued projects

How it works

Interconnection queue status digest, from one answer

  1. Pick the grid operator and enter your queue ID.
  2. ePlan reads the operator's queue file and tracks your phase, dates and neighbors.
  3. Project on federal land or using federal money? Start a NEPA environmental assessment draft.

What you get

Interconnection queue status digest and 1 more document

The check is free. The paperwork after it is drafted at the NEPA environmental assessment door.

The first draft

Interconnection queue status digest (free)

  1. Project, queue ID and point of interconnection
  2. Current phase and cluster
  3. Posted study dates
  4. Deposits and readiness milestones
  5. Changes since the last posting
  6. Other requests at the same substation
Next · 2

NEPA environmental assessment draft

  1. Purpose and need
  2. Alternatives
  3. Affected environment
  4. Environmental consequences
  5. Agencies consulted

From public data

What ePlan fills in, and from where

2,000 GW

were waiting in US interconnection queues by 2022, up from 1,400 GW a year earlier, as average waits grew from about 4 to 5 years
Source: FERC Order No. 2023, 88 FR 61014

Ready for the paperwork?

Draft a NEPA environmental assessment and FONSI, or an EIS outline, that follows a reference document. Free to read; every unconfirmed fact is marked.

NEPA environmental assessment →

Questions

Interconnection Queue Tracker: what people ask

What did FERC Order No. 2023 change?

It replaced the serial queue with a first-ready, first-served cluster study process. Developers pay study and commercial readiness deposits, show site control when they apply, and face withdrawal penalties. Each transmission provider had to adopt a transition process to the new rules.

Source: federalregister.gov

What if my operator's study is late?

Order No. 2023 added study delay penalties measured against the tariff deadline: $1,000 per business day for a late cluster study, $2,000 for a late cluster restudy or affected system study, and $2,500 for a late facilities study.

Source: federalregister.gov

How big are the application fee and study deposit?

Under the pro forma rules in Order No. 2023: a $5,000 application fee plus a study deposit of $35,000 plus $1,000 per MW for 20 to 80 MW, $150,000 for 80 to 200 MW, or $250,000 for 200 MW or more. Your operator's tariff may differ.

Source: federalregister.gov

The rules this door follows