Plants, warehouses and fuel sites that store chemicals

Where is the facility you report for?

Draft your EPCRA Tier II chemical inventory with amounts, locations and contacts in your state's fields, ready to certify by March 1. Free to read.

  • Free to read
  • No sign-up until the draft
  • Every fact cites its source
BUILDINGWORK AREASTOREEXIT

ePlan fills in

  • EPA facility IDs
  • Latitude and longitude
  • Fire department
  • State filing system
  • Over threshold or not

How it works

EPCRA Tier II hazardous chemical inventory, from one answer

  1. Enter the facility address and what you store.One answer starts the project. ePlan names it and looks up the place.
  2. ePlan checks each chemical against the federal thresholds and fills in your fire department and state fields.3 more questions, each with a "not sure yet" way out.
  3. Read the report free, then download it to certify and file by March 1.The draft marks what to check (amber), what to pick (blue) and what to fill in (violet).

What you get

EPCRA Tier II hazardous chemical inventory and 2 more documents

The first draft is free to read. Each document after it is drafted from the same confirmed facts.

The first draft

EPCRA Tier II hazardous chemical inventory

  1. Facility identification, NAICS and coordinates
  2. Owner, operator and emergency contacts
  3. Chemical list with CAS numbers
  4. Physical and health hazard categories
  5. Maximum and average daily amounts
  6. Storage types, conditions and locations

Modeled on: EPA Tier II form and instructions (40 CFR 370.42) and the Tier2 Submit file format

Next · 2

California HMBP (for California sites)

  1. Inventory
  2. Site map
  3. Emergency response plan
  4. Training plan
Next · 3

SPCC plan for oil storage

  1. Oil containers
  2. Containment
  3. Inspections
  4. Spill response

From public data

What ePlan fills in, and from where

March 1

is the yearly deadline to send last year's chemical inventory to the state commission, the LEPC and the local fire department
Source: 40 CFR 370.45, eCFR

Questions

Tier II Report: what people ask

Who has to file Tier II?

A facility that must have a safety data sheet for a hazardous chemical and had 10,000 pounds or more of it at any one time, or 500 pounds or the threshold planning quantity, whichever is lower, of an extremely hazardous substance. Retail stations use 75,000 gallons for gasoline and 100,000 for diesel.

Source: ecfr.gov

Where do I file it?

With your state or tribal emergency response commission, your local emergency planning committee and the local fire department, by March 1 each year. Most states require the Tier II form, and many use their own filing system and extra fields.

Source: epa.gov

Is ePlan the same as E-Plan?

No. E-Plan is a separate filing system some states use. Alabama, for example, accepts filing through E-Plan ($25 per facility per year) or a file from EPA's free Tier2 Submit software. ePlan drafts your inventory; you file it in your state's system.

Source: epa.gov

The rules this door follows