Dutch clients and contractors starting building work

Where is the project?

Draft the V&G plan (safety and health) and BLVC plan (access, livability, safety, communication) for a Dutch building project. Free to read.

  • Free to read
  • No sign-up until the draft
  • Every fact cites its source
BUILDINGWORK AREASTOREEXIT

ePlan fills in

  • Buildings (BAG)
  • Parcel (Kadaster)
  • Local rules
  • Notification threshold

How it works

V&G plan, from one answer

  1. Enter the address and describe the project's size and hazards.One answer starts the project. ePlan names it and looks up the place.
  2. ePlan maps the site and drafts the V&G risks and the BLVC routes.3 more questions, each with a "not sure yet" way out.
  3. Read both plans free, then download them for the client and the gemeente.The draft marks what to check (amber), what to pick (blue) and what to fill in (violet).

What you get

V&G plan and 2 more documents

The first draft is free to read. Each document after it is drafted from the same confirmed facts.

The first draft

V&G plan (veiligheids- en gezondheidsplan)

  1. Description of the works
  2. Companies on site
  3. Coordinators for design and execution
  4. Specific hazards, including asbestos and contaminated soil or water
  5. Hazards from overlapping and successive work
  6. Measures from the risk inventory

Modeled on: Arbobesluit, article 2.28

Next · 2

BLVC plan (bereikbaarheid, leefbaarheid, veiligheid, communicatie)

  1. Site logistics and access routes
  2. Deliveries and traffic plan
  3. Noise, dust and vibration for neighbours
  4. Safety around the site
  5. Communication with residents
Next · 3

AERIUS nitrogen calculation inputs

  1. Machines and hours
  2. Construction traffic
  3. Phases

From public data

What ePlan fills in, and from where

500 person-days

or over 30 working days with more than 20 workers at once means the client must notify the inspectorate and have a V&G plan
Source: Arbobesluit, articles 2.27 and 2.28, wetten.overheid.nl

Questions

V&G plan: what people ask

When is a V&G plan required?

When the works carry special hazards for workers, or when the client must notify the inspectorate: more than 30 working days with over 20 workers on site at once, or more than 500 person-days. The client makes sure the plan is drawn up.

Source: wetten.overheid.nl

What goes in a V&G plan?

A description of the works, the companies on site and the coordinators; the specific hazards, including asbestos and contaminated soil or water, and those from overlapping work; the measures that follow; and the agreements on carrying them out.

Source: wetten.overheid.nl

What does the notification involve?

The client notifies the inspectorate before work on site starts, and a copy of the notification is displayed visibly on the site.

Source: wetten.overheid.nl

The rules this door follows