French contractors on coordinated building sites

Where is the building site?

Draft your PPSPS from the coordinator's PGC and your trade, crew and equipment. For French contractors and subcontractors. Free to read.

  • Free to read
  • No sign-up until the draft
  • Every fact cites its source
BUILDINGWORK AREASTOREEXIT

ePlan fills in

  • Company (Sirene)
  • Site address
  • Coordinator's PGC
  • 30-day deadline

How it works

Plan particulier de sécurité et de protection de la santé, from one answer

  1. Enter the site, upload the coordinator's PGC and describe your crew.One answer starts the project. ePlan names it and looks up the place.
  2. ePlan fills your company data and drafts methods, risks and protections.3 more questions, each with a "not sure yet" way out.
  3. Read the PPSPS free, then download it to sign and send to the coordinator.The draft marks what to check (amber), what to pick (blue) and what to fill in (violet).

What you get

Plan particulier de sécurité et de protection de la santé and 2 more documents

The first draft is free to read. Each document after it is drafted from the same confirmed facts.

The first draft

Plan particulier de sécurité et de protection de la santé (PPSPS)

  1. Company, address and person in charge of the works
  2. Expected headcount on site
  3. Risks from other firms' work and site constraints
  4. Your work methods and the risks they create
  5. Collective and personal protections
  6. Checks and upkeep of protections

Modeled on: Code du travail R4532-63 to R4532-66; OPPBTP Trame de PPSPS

Next · 2

Plan de prévention for work in a client's plant

  1. Joint inspection
  2. Interference risks
  3. Measures by each firm
Next · 3

DUERP (document unique)

  1. Work units
  2. Risks by unit
  3. Action plan

From public data

What ePlan fills in, and from where

30 days

from receiving the signed contract is the time a contractor has to draw up its PPSPS
Source: Code du travail, Article R4532-56, Légifrance

Questions

PPSPS: what people ask

Who must write a PPSPS?

On sites that must have a general coordination plan, every firm called to work there at any point, subcontractors included, writes a PPSPS before starting and sends it to the coordinator. A firm working alone also writes one when the job's length and size pass set thresholds.

Source: legifrance.gouv.fr

Who receives a copy?

The contractor for the structural work or main lot, and any firm doing listed high-risk work, sends a copy before work starts to the labour inspectorate, the social security prevention service and the OPPBTP.

Source: legifrance.gouv.fr

Is there a free official template?

Yes. OPPBTP, the building industry's prevention body, offers a free online PPSPS template (Trame de PPSPS) that firms fill in themselves.

Source: preventionbtp.fr