Builders and owners in a FEMA flood zone

Where will you build?

Free check before you build in a mapped floodplain: flood zone, base flood elevation, floodway and the other permits your community will ask to see.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door
WETLAND · 0.6 AC (NWI) CROSSING · 24 IN CULVERT HUC-12 180201250701

ePlan fills in

  • Flood zone
  • Base flood elevation
  • Floodway
  • Ground elevation

How it works

Floodplain permit pre-application check, from one answer

  1. Pin the site and say what you're building.
  2. ePlan reads the flood map and ground elevation. A surveyor's certificate and your floodplain administrator decide.
  3. Read the free check. Filling a stream or wetland? Start a nationwide permit PCN draft.

What you get

Floodplain permit pre-application check and 1 more document

The check is free. The paperwork after it is drafted at the Pre-Construction Notification door.

The first draft

Floodplain permit pre-application check (free)

  1. Flood zone and base flood elevation
  2. Floodway status
  3. Development planned
  4. Lowest floor elevation needed
  5. Other permits to show, including Section 404
  6. Surveyor and engineer items: elevation certificate, no-rise analysis
Next · 2

Nationwide permit pre-construction notification

  1. Fill in waters or wetlands
  2. Nationwide permit
  3. Species and historic places

From public data

What ePlan fills in, and from where

1%

or greater chance of flooding in any given year is what puts land in a special flood hazard area, where development needs a permit
Source: 44 CFR 59.1, eCFR

Ready for the paperwork?

Draft the Army Corps pre-construction notification (ENG Form 6082) for a dock, bank repair or small crossing. Wetlands and species checked. Free to read.

Pre-Construction Notification →

Questions

Floodplain Development Permit: what people ask

Will the community ask for my other permits?

Yes. Communities must require permits for all proposed development in flood hazard areas and review that all necessary federal and state permits, including Clean Water Act Section 404 permits, have been obtained.

Source: ecfr.gov

How high must a new home be built?

In zones A1-30, AE and AH, new construction and substantial improvement of homes must have the lowest floor, including the basement, at or above the base flood level, unless FEMA has granted the community a basement exception.

Source: ecfr.gov

Can I build in the floodway?

Only if hydrologic and hydraulic analyses, done to standard engineering practice, show the encroachment would not increase flood levels in the community during the base flood.

Source: ecfr.gov