EQIP application prep checklist (free)
- Operation and land control
- Resource concerns by field
- Practices you want and why
- Soils, slopes and water on the land
- Compliance status
- Questions for your NRCS service center
Modeled on: 7 CFR 1466.6 and 1466.20
Farmers, ranchers and forest owners
Get ready for an EQIP application with NRCS: land control, compliance, resource concerns and the practices you want, in one free checklist.
ePlan fills in
How it works
What you get
The check is free. The paperwork after it is drafted at the Texas Wildlife Exemption Plan door.
Modeled on: 7 CFR 1466.6 and 1466.20
From public data
is the longest an EQIP contract can run; it lists each practice, when it goes in and what it pays
Source: 7 CFR 1466.21, eCFR
Draft your Texas wildlife management plan on TPWD form PWD-885, with three of seven practices set up for your land. Free to read, pay to download.
Questions
NRCS may accept applications on a continuous basis throughout the year. It groups them in ranking pools by resource concern and geographic area or type of operation, then ranks them.
A producer who controls the land for the contract term, complies with USDA's highly erodible land and wetland conservation rules, and agrees to carry out an EQIP plan of operations. A tenant may need the landowner's written concurrence.
Up to 10 years. The contract lists every practice, when it will be installed, its operation and maintenance needs, and the payment for each.
Related doors
Where is your land in Texas?
Where will the crane or structure stand?
Where is the covered facility?
Where is the new tower site?
What wastes, from what process?
What are you proposing, and where?
Answer it and ePlan opens the Texas Wildlife Exemption Plan door with your answer filled in.