Massachusetts homeowners building near wetlands

Where is the work near a wetland?

Free check for work near a Massachusetts wetland: are you in the 100-foot Buffer Zone, and what goes in a WPA Form 1 RDA to the Conservation Commission.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door
WETLAND · 0.6 AC (NWI) CROSSING · 24 IN CULVERT HUC-12 180201250701

ePlan fills in

  • Wetlands
  • Streams and ponds
  • 100-foot Buffer Zone
  • Flood zone
  • Parcel

How it works

Buffer Zone check and RDA outline, from one answer

  1. Mark the work and the nearest wetland.
  2. ePlan maps the wetland, the 100-foot Buffer Zone and the flood zone and outlines Form 1.
  3. Read the check free; a wetland scientist flags the edge in the field. Filling a wetland or stream? Start a nationwide permit PCN.

What you get

Buffer Zone check and RDA outline and 1 more document

The check is free. The paperwork after it is drafted at the Pre-Construction Notification door.

The first draft

Buffer Zone check and RDA outline (free)

  1. Property and resource areas
  2. Distance from the work to the wetland edge
  3. Project description
  4. Erosion and sediment controls
  5. Plan sketch notes
  6. Filing and hearing steps

Modeled on: MassDEP WPA Form 1, Request for Determination of Applicability

Next · 2

Nationwide permit pre-construction notification (ENG 6082)

  1. Activity and nationwide permit
  2. Waters and wetlands affected
  3. Avoidance and minimization
  4. Compensatory mitigation

From public data

What ePlan fills in, and from where

100 feet

from a wetland or other resource area is the Massachusetts Buffer Zone, where work may need a Conservation Commission filing
Source: 310 CMR 10.02(2)(b)

Ready for the paperwork?

Draft the Army Corps pre-construction notification (ENG Form 6082) for a dock, bank repair or small crossing. Wetlands and species checked. Free to read.

Pre-Construction Notification →

Questions

Request for Determination of Applicability: what people ask

What is the Buffer Zone?

The land within 100 feet of a wetland or other resource area protected under the Massachusetts Wetlands Protection Act regulations.

Source: law.cornell.edu

How fast does the Commission answer?

The Conservation Commission makes a written determination within 21 days of receiving a written request.

Source: malegislature.gov

What form is an RDA filed on?

WPA Form 1. The Commission answers with a Determination of Applicability on Form 2, which is valid for 3 years.

Source: law.cornell.edu

The rules this door follows