Manufacturers, contractors and towns on federal infrastructure jobs

What product or material is it?

Check a product or project against Build America, Buy America: iron and steel, the 55% component test, construction materials and waivers. Free.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door
BUILDINGWORK AREASTOREEXIT

ePlan fills in

  • Product category
  • 55% component test
  • Funding program
  • Waiver types

How it works

BABA screening checklist, from one answer

  1. Name the product, your role and the funding program.
  2. ePlan sorts it into a BABA category and works the 55% test from your costs.
  3. Read the free checklist. Need the project's NEPA paperwork? Start a categorical exclusion memo.

What you get

BABA screening checklist and 2 more documents

The check is free. The paperwork after it is drafted at the Categorical exclusion memo (or short EA) in the agency's format door.

The first draft

BABA screening checklist (free)

  1. Product and category: iron or steel, manufactured product, construction material
  2. Where each manufacturing step happens
  3. Component costs and origins (55% test)
  4. Waivers that may apply
  5. What a certification letter should say
  6. Records to keep

Modeled on: 2 CFR part 184

Next · 2

NEPA categorical exclusion memo

  1. Proposed action and CE category
  2. Extraordinary circumstances
  3. Determination
Next · 3

Waiver request outline

  1. Item and quantity
  2. Waiver basis
  3. Supporting evidence

From public data

What ePlan fills in, and from where

55%

of the cost of a manufactured product's components must be U.S.-made for the product to count as produced in the United States
Source: 2 CFR 184.5, eCFR

Ready for the paperwork?

Draft a NEPA categorical exclusion memo or short environmental assessment for a federally funded project, in the agency's format. Free to read.

Categorical exclusion memo (or short EA) in the agency's format →

Questions

BABA Compliance Checklist: what people ask

When is an iron or steel product made in the U.S.?

When all manufacturing processes, from the initial melting stage through the application of coatings, happen in the United States.

Source: ecfr.gov

How does the 55% test work?

A manufactured product counts as produced in the U.S. if it was manufactured in the U.S. and the cost of its U.S.-mined, produced or manufactured components is more than 55% of the total cost of all its components.

Source: ecfr.gov

Can the preference be waived?

Yes. A federal agency may waive it if applying it is against the public interest, if U.S. products are not available in enough quantity or quality, or if using them would raise the overall project cost by more than 25%. Recipients may request a waiver.

Source: ecfr.gov

The rules this door follows