Tradies and subcontractors doing high risk construction work

Where is the job?

Free SWMS check for high risk construction work: whether you need one, the 18 work types that trigger it and what the statement must contain.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door
BUILDINGWORK AREASTOREEXIT

ePlan fills in

  • High risk work types
  • State rules
  • Required contents

How it works

SWMS check and contents list, from one answer

  1. Pick the high risk work and enter the site.
  2. ePlan checks it against the 18 types and lists what your SWMS must cover.
  3. Read the check free. Consent asks for an environmental plan too? Start a CEMP draft.

What you get

SWMS check and contents list and 1 more document

The check is free. The paperwork after it is drafted at the CEMP door.

The first draft

SWMS check and contents list (free)

  1. Is it high risk construction work?
  2. Which of the 18 types applies
  3. Hazards and risks
  4. Control measures
  5. How controls are put in place, monitored and reviewed
  6. Fit with the WHS management plan

Modeled on: Safe Work Australia SWMS information sheet

Next · 2

WHS management plan

  1. Roles
  2. Consultation
  3. Incidents
  4. Site rules
  5. SWMS

From public data

What ePlan fills in, and from where

$200,000

fine for a Victorian demolition company on a single charge of doing high risk construction work without first preparing a SWMS
Source: WorkSafe Victoria, June 2026

Ready for the paperwork?

A construction environmental management plan drafted from your DA consent conditions: dust, noise, runoff, waste and hours. Free to read.

CEMP →

Questions

SWMS: what people ask

When do I need a SWMS?

Before high risk construction work starts. The WHS Regulations list 18 types, including work with a risk of a fall of more than 2 m, trenches or shafts deeper than 1.5 m, demolition of load-bearing parts, work near energised electrical services and work next to roads in use by traffic.

Source: legislation.gov.au

What must a SWMS contain?

It must identify the high risk construction work, specify the hazards and risks to health and safety, and describe the control measures and how they will be put in place, monitored and reviewed. It must take the workplace's circumstances and the WHS management plan into account.

Source: legislation.gov.au

Is it different in Victoria?

Victoria has its own OHS laws but also expects a SWMS before high risk construction work. In June 2026 WorkSafe Victoria reported a demolition company fined $200,000 on a single charge of doing that work without first preparing one.

Source: worksafe.vic.gov.au

The rules this door follows