Solar, wind and pipeline developers on Illinois farmland

Which state and county is the project in?

Free checklist for an Illinois agricultural impact mitigation agreement for solar or wind on farmland: who needs one, when, and what it covers.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door
A HORIZON · LOAMB · SANDY LOAM · PERC 24 MIN/INSEASONAL HIGH WATER · 54 IN 1,000 GAL

ePlan fills in

  • Parcel and acres
  • Prime farmland soils
  • Ditches and streams
  • Aerial view

How it works

AIMA readiness checklist, from one answer

  1. Enter the county, project type and acres of farmland.
  2. ePlan maps soils and drainage and checks what Illinois' standard agreement asks of you.
  3. Need federal review for the project too? Start a NEPA environmental assessment draft.

What you get

AIMA readiness checklist and 1 more document

The check is free. The paperwork after it is drafted at the NEPA environmental assessment door.

The first draft

AIMA readiness checklist (free)

  1. Facility owner, county and site
  2. Does the AIMA law apply (500 kW, landowner property)
  3. Topsoil removal and replacement
  4. Drain tile location, rerouting and repair
  5. Underground cable depth
  6. Deconstruction plan and financial assurance

Modeled on: Illinois Department of Agriculture Standard Solar AIMA (version 8.19.19)

Next · 2

NEPA environmental assessment draft

  1. Purpose and need
  2. Alternatives
  3. Affected environment
  4. Environmental consequences
  5. Agencies consulted

From public data

What ePlan fills in, and from where

500 kW

of nameplate capacity is where an Illinois solar facility counts as a commercial solar energy facility under the AIMA law
Source: 505 ILCS 147/10

Ready for the paperwork?

Draft a NEPA environmental assessment and FONSI, or an EIS outline, that follows a reference document. Free to read; every unconfirmed fact is marked.

NEPA environmental assessment →

Questions

Agricultural Impact Mitigation Agreement: what people ask

Who needs an AIMA in Illinois?

Owners of commercial solar or wind facilities on landowner property must enter an agreement with the Illinois Department of Agriculture setting construction and deconstruction standards that protect farmland. Solar construction must follow the Department's standard agreement.

Source: ilga.gov

When must it be signed?

Before the date of the county's required public hearing on the siting permit. The county then makes its siting decision within 30 days after the hearing ends.

Source: ilga.gov

What does the standard solar agreement cover?

Restoring farmland after construction and removal, topsoil removal and replacement, finding and repairing drain tile, underground cable depth, a deconstruction plan by an Illinois-licensed engineer, and financial assurance phased in to the county.

Source: agr.illinois.gov

The rules this door follows