Small builders and self-builders in England

Where is the site?

Draft the sustainable drainage (SuDS) statement councils ask for: runoff destination, the first 5 mm of rain, maintenance. Free to read, pay to download.

  • Free to read
  • No sign-up until the draft
  • Every fact cites its source
STABILIZED ENTRANCE SILT FENCE · 340 FTINLET PROTECTION DISTURBED AREA · 1.4 AC

ePlan fills in

  • Flood zone
  • Surface water flood risk
  • Geology for soakaways
  • Local planning authority

How it works

Sustainable drainage (SuDS) statement, from one answer

  1. Enter the site and the new roof and paved areas.One answer starts the project. ePlan names it and looks up the place.
  2. ePlan maps flood risk and ground conditions and works through the seven SuDS standards.3 more questions, each with a "not sure yet" way out.
  3. Read the statement free, then download it for your application or drainage engineer.The draft marks what to check (amber), what to pick (blue) and what to fill in (violet).

What you get

Sustainable drainage (SuDS) statement and 2 more documents

The first draft is free to read. Each document after it is drafted from the same confirmed facts.

The first draft

Sustainable drainage (SuDS) statement

  1. Site and proposal
  2. Existing drainage and flood risk
  3. Runoff destination and the hierarchy (Standard 1)
  4. Everyday rainfall: the first 5 mm (Standard 2)
  5. Extreme rainfall and flood routes (Standard 3)
  6. Water quality, amenity and biodiversity (Standards 4 to 6)

Modeled on: Defra National standards for sustainable drainage systems (SuDS), June 2025

Next · 2

Flood risk assessment

  1. Flood zone and sources
  2. Floor levels
  3. Resistance and resilience
Next · 3

Design and access statement

  1. Design principles
  2. Context
  3. Access

From public data

What ePlan fills in, and from where

5 mm

of rainfall, for most rain events, should not leave the site as runoff under the national SuDS standards
Source: Defra, National standards for sustainable drainage systems, Standard 2

Questions

SuDS Statement for Small Schemes in England: what people ask

Do small schemes need a SuDS statement?

National policy asks for a statement outlining how the national SuDS standards have been met for development that could affect drainage on or around the site. The detail should be proportionate to the scheme.

Source: gov.uk

Where should the rainwater go?

The standards set an order of preference: collect it for non-potable use, then infiltrate it into the ground, then discharge to a surface water body, then a surface water sewer, and a combined sewer last. Using a lower option needs justifying.

Source: gov.uk

Who checks the drainage design?

The local planning authority decides it as part of the application. For major development it should take account of advice from the Lead Local Flood Authority. The system also needs maintenance arrangements for the development's lifetime.

Source: gov.uk

The rules this door follows