Silviculturists and consulting foresters

Which stand are you prescribing for?

Draft a silvicultural prescription: stand diagnosis, objectives, treatment and marking guide from your stand data. Free to read, ready to sign.

  • Free to read
  • No sign-up until the draft
  • Every fact cites its source

ePlan fills in

  • Stand boundary
  • Forest type and fuels
  • Slope and aspect
  • Soils
  • Streams

How it works

Silvicultural prescription, from one answer

  1. Pick the stand and the objective.One answer starts the project. ePlan names it and looks up the place.
  2. ePlan pulls forest type, fuels, slope and soils and drafts the diagnosis.3 more questions, each with a "not sure yet" way out.
  3. Read the prescription free, then download it for the silviculturist to sign.The draft marks what to check (amber), what to pick (blue) and what to fill in (violet).

What you get

Silvicultural prescription and 3 more documents

The first draft is free to read. Each document after it is drafted from the same confirmed facts.

The first draft

Silvicultural prescription

  1. Stand location and history
  2. Existing condition and diagnosis
  3. Management objectives and desired condition
  4. Treatment and silvicultural system
  5. Marking guide
  6. Regeneration and follow-up treatments

Modeled on: Forest Service Manual 2470, Silvicultural Practices

Next · 2

Marking guide

  1. Trees to leave
  2. Trees to cut
  3. Paint colors and boundaries
Next · 3

Timber sale contract

  1. Timber sold and price
  2. Operating terms
  3. Closeout
Next · 4

Categorical exclusion decision memo

  1. Proposed action
  2. Exclusion relied on
  3. Extraordinary circumstances
  4. Decision

From public data

What ePlan fills in, and from where

40 acres

is the largest clearcut opening allowed on most National Forest types; 60 for Douglas-fir and 80 for southern yellow pine
Source: 36 CFR 219.11(d)(4), eCFR

Questions

Silvicultural prescription: what people ask

Who signs a Forest Service prescription?

Forest Service silvicultural prescriptions are prepared or reviewed by a certified silviculturist before the project or treatment is carried out, under Forest Service Manual 2470.

Source: fs.usda.gov

How big can a National Forest clearcut be?

The planning rule caps openings at 60 acres for Douglas-fir in California, Oregon and Washington, 80 acres for southern yellow pine, 100 acres for hemlock-Sitka spruce in coastal Alaska, and 40 acres for all other forest types.

Source: ecfr.gov

When can even-aged cuts be used on National Forests?

Only where a clearcut is the optimum method, or another even-aged cut is appropriate, to meet the land management plan; after interdisciplinary review of the impacts; and with cut blocks shaped and blended with the terrain, among other conditions.

Source: law.cornell.edu

The rules this door follows