Free check for Swedish building projects: is an arbetsmiljöplan required, which risky works it must cover, and the sanction fee if it's missing.

  • Free to read
  • No sign-up until the draft
  • Hands off to the right door
BUILDINGWORK AREASTOREEXIT

ePlan fills in

  • Property (fastighet)
  • Advance notice test
  • Risky works list
  • Bas-P and Bas-U

How it works

Arbetsmiljöplan check, from one answer

  1. Enter the site and describe the project's size and risky works.
  2. ePlan checks whether a plan is required and lists what it must cover.
  3. Read the free check. Building under a bygglov? Start a kontrollplan draft.

What you get

Arbetsmiljöplan check and 2 more documents

The check is free. The paperwork after it is drafted at the Kontrollplan for Your Bygglov, Drafted door.

The first draft

Arbetsmiljöplan check (free)

  1. Project, client and site
  2. Is a plan required: advance notice size or risky works
  3. Works with particular risks and their measures
  4. How work environment efforts are organised, with contacts
  5. Common site rules
  6. Handover from Bas-P to Bas-U

Modeled on: AFS 2023:3, chapters 2 and 11

Next · 2

Common site rules (ordnings- och skyddsregler)

  1. Protective equipment
  2. Shared scaffolds and platforms
  3. Lifting and signals
Next · 3

Kontrollplan for the bygglov (paid draft)

  1. Checks and who does them
  2. Notices to the building committee
  3. Site visits

From public data

What ePlan fills in, and from where

SEK 50,000

is the sanction fee when a client lets building work start without a written arbetsmiljöplan on a project that needs advance notice
Source: AFS 2023:3, chapter 2, section 22, Arbetsmiljöverket

Ready for the paperwork?

Draft the kontrollplan for your bygglov: which checks, who does them and what to report to the building committee. For Swedish builders. Free to read.

Kontrollplan for Your Bygglov, Drafted →

Questions

Arbetsmiljöplan: what people ask

When is an arbetsmiljöplan required?

When any work with particular risks takes place, such as fall risk of 2 metres or more, risk of burial or work near high-voltage lines, or when the project needs advance notice: over 30 working days with more than 20 people at once, or over 500 person-days.

Source: av.se

What is the fee if the plan is missing?

The client pays SEK 50,000 if the project's size requires advance notice, otherwise SEK 10,000. No fee applies if all the building work lasts at most two days in a row.

Source: av.se

Who writes it, and who keeps it?

The client makes sure it is written before the first building work starts. Bas-P develops it during design and hands it to Bas-U before work begins; Bas-U keeps it available on site so everyone working there can read it.

Source: av.se

The rules this door follows