Dock permit route check (free)
- Waterbody and who manages it
- Agencies to file with
- Size limits that apply
- Drawings needed
- Wetlands and grass beds nearby
- Next steps
Lake house owners planning a dock or boat lift
Free check of who permits your dock, pier or boat lift, the Army Corps, TVA or your state, and the size limits that apply. Not legal advice.
ePlan fills in
How it works
What you get
The check is free. The paperwork after it is drafted at the Pre-Construction Notification door.
From public data
is the total footprint TVA allows for a private dock and its other water-use facilities, or 1,800 sq ft in some older subdivisions
Source: 18 CFR 1304.204, eCFR
Draft the Army Corps pre-construction notification (ENG Form 6082) for a dock, bank repair or small crossing. Wetlands and species checked. Free to read.
Questions
Structures in navigable waters of the United States need Corps authorization under Section 10 of the Rivers and Harbors Act. It can come through a nationwide permit, a regional general permit or an individual permit.
Yes, along TVA-managed reservoirs and streams. Section 26a approval is required before building docks, piers, boathouses and similar structures.
Private water-use facilities are limited to a 1,000 sq ft total footprint, or 1,800 sq ft in some subdivisions recorded and permitted before November 1, 1999. Applicants must send accurate drawings with dimensions.
Related doors
Where is the work in or near water?
Where is the new driveway?
Where is the building coming down?
Where does the line cross your land?
Paste the legal description from your deed
What is the project, and where?
Answer it and ePlan opens the Pre-Construction Notification door with your answer filled in.